EbbwJunction1
Established Member
Ilford is also a DfT Category C2 station.
And in the current COVID timetable two diagrams are operating for most of the day on Temple Meads-Gloucester services so might be worth looking at for some after lockdown ends if that's your sort of thing.In the current (non COVID) GWR Timetable the 2C65 0700 Gloucester - Taunton is operated by a "castle" set.
Frequently requested diagrams
It is the intention to reinstate this thread for the start of the new TT in May 2025. If anyone can offer up diagrams then please PM me with them and I will add them to this thread. In particular I am after the following: 1. Chiltern Class 68 2. TfW Class 67 3. Scotrail HST 4. LNER Class 91 5...www.railforums.co.uk
Raynes Park is also a four platform station in TfL Zone 4.
And in the current COVID timetable two diagrams are operating for most of the day on Temple Meads-Gloucester services so might be worth looking at for some after lockdown ends if that's your sort of thing.

Altrincham was also the scene of a rail accident in 1933.
Chinley is where the two parts of the Hope Valley Line separate to run via Stockport and Guide Bridge respectively. The last station on the former "branch" before the two lines reunite is Levenshulme.
No, that's the one prior to Levenshulme.
The different bits of the Hope Valley lines only join back at Ardwick Junction.From Piccadilly, it's Levenshulme then Heaton Chapel, then they divide don't they?
Welham Green is another station with 2 platforms either side of a 4 track mainline.Chinley is where the two parts of the Hope Valley Line separate to run via Stockport and Guide Bridge respectively. The last station on the former "branch" before the two lines reunite is Levenshulme.
The different bits of the Hope Valley lines only join back at Ardwick Junction.
Welham Green is another station with 2 platforms either side of a 4 track mainline.