LNW-GW Joint
Veteran Member
There's no reason why a direct award shouldn't include improvements
Except the DfT doesn't want to spend the money without a competitive bid.
The WC and XC direct awards have been straightjackets, to maximise premiums.
There's no reason why a direct award shouldn't include improvements
The NHS in England has been split into multiple commissioning areas so that Ministers can say "local decision, nothing to do with us" and abdicate responsibility while offering inadequate resources.The NHS doesn't act fairly.
Different areas of the country have access to different treatments.
Award the franchises that are currently "to let" on the old system and start afresh with the new ones.
Yes, lengthly direct awards that will do nothing to improve things for passengers.
Good approach![]()
Why is nothing allow to improve for passengers with lengthy direct awards?Yes, lengthly direct awards that will do nothing to improve things for passengers.
Good approach![]()
Why is nothing allow to improve for passengers with lengthy direct awards?
Agree completely. There need to be regular reviews liked happened(s) with Chiltern but I doubt the Chiltern format would work in more than half of Franchises, many would need a more comprehensive review process (which could end up as problematic as direct awards!)The concern I have with long franchises is that there'll be new trains in the first 2-3 years and then nothing until the next franchise is let.
There could be ways to overcome this concern, but it needs to be something which is dealt with before any change is made.
The concern I have with long franchises is that there'll be new trains in the first 2-3 years and then nothing until the next franchise is let.
There could be ways to overcome this concern, but it needs to be something which is dealt with before any change is made.
When trains are designed to last 30 years, having new trains in the first 2-3 years and then nothing until the next franchise seems reasonable. The point which is more pertinant is that there should be an ongoing review of the service offered (timetable, capacity etc). New trains isn't everything but a review which identifies how the service can be reviewed and improved after the first five years might work.
If you go back to the original round of franchises, some were let on 15 year terms precisely because they included new train fleets - the others were let on the basis of seven years. More recently, this became shorter franchises for all, but not before Chiltern got 20 years on the basis of rolling improvements and review (although you could argue that they are now in the lean period of improvements you are concerned about).
I'm not sure how franchising really works at all for service users. You can end up with a good provider being replaced with a bad provider because the government decide bring in new 'compliances'. You can end up with a terrible company running a franchise for 8 years with no real recourse, they can bid again and as long as they are 'compliant' they can win again with lots of empty promises.
No it doesn't. That just means the company who makes the best promises. Premiums stated at the time of the bid don't equal premiums received as VTEC showed.It ensures value to the taxpayer, as the winner is the company with the best bid, ie the best value for money
No it doesn't. That just means the company who makes the best promises. Premiums stated at the time of the bid don't equal premiums received as VTEC showed.
Theoretically DfT goes for the MEAT,
which is based on the formula P+nQ
You beat me to it posting that information.MEAT = Most Economically Advantageous Tender
P = Price, Q = Quality, and n is a figure set by DfT, which is supposed to balance the two to best effect. I'm not convinced that they get it right - probably the value they get depends on what they decide they want and the assumptions they make about what it will cost and what it's worth.

It is unfair because Croesus Railways Limited doesn’t exist. How can you run a fair procurement if the only bidders are those who are backed by their State or are able to make decisions to invest where they don’t have to comply with the law. Or worry about financial consequences. Stagecoach has to comply with all the various bits of legislation and also the sentiment of the market (because it’s listed). t. A state bidder or a quasi state bidder through a corporate vehicle doesn’t have the same. So it’s not a fair procurement because the result is a foregone conclusion - no prudent private operator can win as their financial model will almost by definition be non-compliant. So only a state operator can win.I don't see how it in itself is unfair. It just means they will need to bid for a higher subsidy /lower franchise premiums to cover the possible risk that this could possibly cause
It is unfair because Croesus Railways Limited doesn’t exist. How can you run a fair procurement if the only bidders are those who are backed by their State or are able to make decisions to invest where they don’t have to comply with the law. Or worry about financial consequences. Stagecoach has to comply with all the various bits of legislation and also the sentiment of the market (because it’s listed). t. A state bidder or a quasi state bidder through a corporate vehicle doesn’t have the same. So it’s not a fair procurement because the result is a foregone conclusion - no prudent private operator can win as their financial model will almost by definition be non-compliant. So only a state operator can win.
VTEC did honour their premium commitments paying up in full until the franchise was terminated.
The government also shares a responsibility to provide the infrastructure and other commitments that it asks bidders to assume as a baseline in their bid. The government is also responsible for checking the bidders math and evaluating whether its financially deliverable and assigning a risk value which is knocked off the bid evaluation score.
However their bid was aggressively back end loaded in terms of premium payments, and I’m guessing that is why they won. So they won but got out before the going got tough and thus didn’t deliver on their overall promise. A point that the Govt conveniently ignored when saying that Virgin had paid everything they had promised to.
That’s very true, and I had forgotten that point. Although as I understand it, up to the point of default NR had delivered everything expected of it, and still the franchise was haemorrhaging money due to growth expectations not being achieved. So even if an appropriate adjustment could have been negotiated for the non-delivery of NR improvements (which I suspect it could have been), Virgin wasn’t interested as they were already holed below the waterline.To be fair the Government didn't honour their upgrade commitments on the line which VTEC based their models on, so they are also responsible.
The final growth (and other numbers) numbers were based on a date just before the bid submission but growth (under EC) between that point and the start of the VTEC era was substantially lower so on Day 1 annual revenues were an 8 digits sum lower than they were told to assume in the bid. No realistic way to recover from that either.That’s very true, and I had forgotten that point. Although as I understand it, up to the point of default NR had delivered everything expected of it, and still the franchise was haemorrhaging money due to growth expectations not being achieved. So even if an appropriate adjustment could have been negotiated for the non-delivery of NR improvements (which I suspect it could have been), Virgin wasn’t interested as they were already holed below the waterline.
That’s very true, and I had forgotten that point. Although as I understand it, up to the point of default NR had delivered everything expected of it, and still the franchise was haemorrhaging money due to growth expectations not being achieved. So even if an appropriate adjustment could have been negotiated for the non-delivery of NR improvements (which I suspect it could have been), Virgin wasn’t interested as they were already holed below the waterline.