In the weekly ops notices, there's mention of some works at New St station in connection with stage 7 of the resignalling. Now IIRC this is the biggie, taking control of the station area signalling. Thought this wasn't starting for a while, so I presume that it's either the early steps for the future renewal , or its actually happening. Anyone know anything concrete?