Although the depot manager had repaired the DSD, it failed again and was
isolated by the technician on board the locomotive, in the vicinity of the gates
just before the locomotive crossed the boundary between Washwood Heath
depot and Network Rails main line infrastructure
Rule breaking
The locomotives national radio network (NRN) radio also failed at Duddeston
Junction, after the driver and technician changed ends to reverse the locomotive
immediately following departure from the depot. The driver did not stop and
report the failure of either of these safety systems to the signaller as required by
Module TW5 of the Rule Book.
Rule breaking
He and the
technician subsequently both stated that the speedometer had been stuck, and
that it had indicated a maximum speed of 55 mph (89 km/h).
Anyone knows the difference between 55mph and 100mph especially a qualified train driver
The permissible speed on the Down Main line is 90 mph (145 km/h)10, and the
light locomotive should have been driven at no more than 75 mph (121 km/h), as
required by Module TW3 of the Rule Book.
Rule breaking
A driver with sufficient route knowledge would anticipate
the possible need to brake at certain locations before a signal came into view.
This a qualified driver with route knowledge does every day but in this admittance by NR I feel that if the braking distance is not sufficient and they expect a driver to anticipate a signal the infrastructure is at fault, at the minimum a "green banner" should be installed at the said location.
In my opinion I feel the same as other people in that this whole incident is a total breach of rules and regulations across the board. How was this allowed to happen? It is playing trains and I can associate this in the same context as if someone has bough a new car and taken it out on the motorway and then been caught speeding at 100mph? The drivers route knowledge must come into questions as I signed that route and the signal that would have been showing 2 yellow aspects is known and yes, I anticipated this signal, and yes I have driven a light loco over this route. The signal displaying the 2 yellow aspects if you are aware of your route risks is one of the main risks of the route due to it's distance from the red aspect, the line speed and the signals sighting. If a driver has a competent route knowledge over this section they must know these risks. This signal is displaying 2 yellows very frequently as Stafford is a busy station and on many occasions especially if you are freight, light engine or ECS will almost certainly be displaying 2 yellows.
The whole report is condemning all concerned and it seems that actions have been taken however the main concern is how did it come to the stage where a company can think they can operate totally ignoring the fundamental rules of railway operation.
If this had been a qualified driver for a TOC the said driver would have most likely been dismissed, if it had been a TOC the most likely scenario would have been for the TOC to be stripped of it's franchise.
Keep the relics off the main line I think unless the companies running these trains adhere to the same working conditions as the commercial railway companies.