• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

St Ives branch improvements

Status
Not open for further replies.

Requeststop

Member
Joined
21 Jan 2012
Messages
1,001
Location
Carbis Bay, St Ives, Cornwall
News has filtered to me of Platform extensions at St Erth and Lelant for summertime 5 coach trains along the branch. All very welcome. I was wondering if this means that my home station Lelant will now loose it's request stop status and if so, would this be just for the summertime services only? Has anyone any idea of the planned services?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,269
There’s a recent thread about potential changes to rolling stock on the branch here:

towards the end of the thread the linked reports state that St Erth has had only a 6m extension.
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Several pictures of work at Lelant and St Erth on the Network Rail website. Click on the page numbers 6 or 7 here (may become a different number if you're seeing this a while after I wrote it).

 

AndyNLondon

Member
Joined
20 Jan 2014
Messages
191
Several pictures of work at Lelant and St Erth on the Network Rail website. Click on the page numbers 6 or 7 here (may become a different number if you're seeing this a while after I wrote it).

The direct link to the press release with those photos is https://www.networkrailmediacentre....st-ives-following-west-cornwall-rail-upgrades - for the platform extensions, they say:
At Lelant the existing platform has been extended by 13 metres while at St Erth the platform has been extended by six metres. The platforms are expected to be commissioned and approved to welcome the first five-carriage trains later this year with GWR planning on operating these longer trains during the peak summer months.
 
Status
Not open for further replies.

Top