Hello,
Does anyone know where I could find information for the service patterns on the SPT Network pre-Airdrie - Bathgate re-opening?
I've searched on google but haven't been able to find anything.
Thanks.
Which parts do you mean and when?
Assuming you mean the North Clyde routes, in the immediate run up to Airdrie-Bathgate re-opening was quite similar in that there was:
Helensburgh-Drumgelloch every 30 mins (which became through Edinburgh service)
Balloch-Airdrie every 30 mins
Milngavie-Bellgrove every 30 mins (ECS to Shettleston loop - became through Edinburgh service).
Dalmuir-Springburn every 30 mins.
The Milngavie-Bellgrove service was a late introduction which was a forerunner of through Edinburgh service. Historically it had been Milngavie-Springburn every 30 mins. The Dalmuir-Springburn introduced was also aimed at providing every 15 min service via Yoker - at the same time the Milngavie branch went every 15 mins with services to the Argyle line when Larkhall opened in 2006.
Did the Class 334s work any North Clyde services before the Bathgate line reopening?
The Yoker route was already every 15 minutes in 2004 albeit the North Clyde trains ran Dalmuir to Bellgrove rather than Springburn. When did the timetable go non symettrical, i.e. trains to Larkhall run via Singer but from Larkhall run via Yoker?Which parts do you mean and when?
Assuming you mean the North Clyde routes, in the immediate run up to Airdrie-Bathgate re-opening was quite similar in that there was:
Helensburgh-Drumgelloch every 30 mins (which became through Edinburgh service)
Balloch-Airdrie every 30 mins
Milngavie-Bellgrove every 30 mins (ECS to Shettleston loop - became through Edinburgh service).
Dalmuir-Springburn every 30 mins.
The Milngavie-Bellgrove service was a late introduction which was a forerunner of through Edinburgh service. Historically it had been Milngavie-Springburn every 30 mins. The Dalmuir-Springburn introduced was also aimed at providing every 15 min service via Yoker - at the same time the Milngavie branch went every 15 mins with services to the Argyle line when Larkhall opened in 2006.