What, like NR were aware of the heatwave forecast days in advance yet all they could come up with was this contingency plan of speed restrictions?
Presumably they should have hired in Mr Freeze?
What, like NR were aware of the heatwave forecast days in advance yet all they could come up with was this contingency plan of speed restrictions?
FGW are probably the most creative of all TOC's when it comes to finding reasons not to run trains! So the points for both Marlow and Henley branches are for some reason more susepable to heat than all the other points in thus area! My bet it is summertime, there is a shortage of train crews/stock and FGW had to find an excuse as why they have had to cancel services!
HC
I live in South Australia, one of those other places where the conditions for the rails are much tougher. After a lengthy period of track rebuilding, our suburban network is now at the point where we don't get rail-related disruption even when the maximum temperature is into the mid 40s. When things do start going wrong, in general the problems we do get are equipment failures rather than issues with the rails.
Ultimately though it doesn't matter how many logical reasons are given Joe Public (after a hard day at work, has his normal train cancelled so has to endure the next boiling hot and overcrowded service which then runs late) is going to wonder what's going on. The rail industry is in a no win situation whatever. It might not be right but that's the way it is.
Ultimately though it doesn't matter how many logical reasons are given Joe Public (after a hard day at work, has his normal train cancelled so has to endure the next boiling hot and overcrowded service which then runs late) is going to wonder what's going on. The rail industry is in a no win situation whatever. It might not be right but that's the way it is.
Hardly; the shareholders might disagree with you there.
I have no axe to ginnd with NR, the problem is lack of forward planning when the Met Office has forecast this heatwave since last week. Even just informing passengers would've been enough.
Hardly; the shareholders might disagree with you there.
I have no axe to ginnd with NR, the problem is lack of forward planning when the Met Office has forecast this heatwave since last week. Even just informing passengers would've been enough.
I think one way that Network Rail could show the serious safety implications of not introducing the heat restrictions is by making some kind of film showing what would have if a train hit a buckled rail at full speed. Because those that are moaning about the speed restrictions would be the first to ask why there weren't any if there was a major crash.
So if the TOCs had announced a few days ago that "services will be subject to potential cancellation and delay in the event of high temperatures" you would have been satisfied?
So if the TOCs had announced a few days ago that "services will be subject to potential cancellation and delay in the event of high temperatures" you would have been satisfied?
But they were still caught out, just look at the number of imposed speed restrictions.
'NR can't win' is a bit disingenuous to say the least.
But they were still caught out, just look at the number of imposed speed restrictions.
'NR can't win' is a bit disingenuous to say the least.
Is it? You need only look at the reactions when it was decided to pre-emptively suspend services well in advance of the big storms last year.But they were still caught out, just look at the number of imposed speed restrictions.
'NR can't win' is a bit disingenuous to say the least.
Does it make any difference when the trains are either longer but less frequent or shorter but more frequent?
Not so. At this time of year, rail temps will be +18c above ambient in sunny weather, +15C in partly cloudy, +13C in full high cloud, and +8C in full grey cloud.
Those comparing our railways with continental Europe are really comparing apples and oranges. For starters, their railways are run as a public service rather than to line pockets of shareholders, ergo, they are considerably more safer and well-designed to cope with all weather conditions.
Well this morning we had problems with the OHLs at Colchester. That's another issue, especially on routes like the GEML, which has old wires along much of the route.
What, like NR were aware of the heatwave forecast days in advance yet all they could come up with was this contingency plan of speed restrictions?
sorted 
The only option to stop buckling rails (as I understand it, but I'm a mere signaller not a track engineer!) is to go out and restress all the track for a higher temp.
Now the problems with this:
1) man power, it would take a LONG time. Time that NR simply do not have, teams are occupied with more important tasks.
2) cost
3) what's the point for a week or two, soon as the temp starts dropping again it will have to be restressed so it doesn't crack when it contracts due to the lower temps.
Or, a cheaper and easier solution: add sprinklers that spray cool water onto the rails. It'll be just like driving in the rain. No restressing rails. No extra ballast - sorted cheaper.
Except when there's a hosepipe ban!![]()
Serious question. Would/could that actually be practical, or would it entail am unrealistically massive cost? Is there anywhere that does this?1) re stress the lot twice a year
I can agree with that, having looked out of the windows of my creaking 321 the other day to realise that NR have done absolutely no vegetation control on the GEML...
Or, a cheaper and easier solution: add sprinklers that spray cool water onto the rails. It'll be just like driving in the rain. No restressing rails. No extra ballast - sorted cheaper.
There are plenty of other places with railways that have a much wider temperature range than Britain. How do they cope?
- Heavier or closer spaced sleepers?
- More ballast?
- Re-stressing the rail twice a year?
- Breather switches?
- Jointed rail?
- Something else?
Or do they just accept a greater level of risk?
Or do they all impose restrictions too, we just don't get to hear about them?
Pretty clear they don't consider slab track to be necessary, otherwise it would be much more widespread than it is in those countries.
Wouldn't heavier rail just actually make things worse by increasing the expansion forces?
Well Southeastern were giving out free water bottles yesterday. Without any water though. I saw a picture on Facebook with a sarcastic comment to go with it.i love the twitter feeds on the TOC twitter accounts which remind people to carry a bottle of water with them when travelling. thanks for stating the bloody obvious!
I'm surprised their wasn't heat related delays on the South West Trains mainline yesterday. The one through Earlsfield. I'd have expected them.Most renewals are to those specs these days but what you need to realise is most buckles are caused by ballast disturbance. It is not just a case of rails getting hot and buckling. Most heat related speed restrictions will be imposed at sites where ballast has been recently disturbed or the rail has inadequate stress. Also G44 sleepers use fastclips that have a higher toe load than pandol 401 clips or e1809 (eclips) that are used on older sleepers which means there is more resistance to expansion and contraction.
Every section of track will have a CRT (Critical Rail Temperature) and there are many factors that reduce this. An undisturbed site on concrete sleepers will hold up in the heat far better than track on wood sleepers etc. Also if a section of track is not stressed to the required temperature then this will effect the CRT. Low ballast has a very negative effect on CRT. For jointed track it is slightly different but again if a site has joints regulated properly it will have a much higher CRT than a site where the expansion joints are incorrectly set.
It is not just simply a bit of sun expanding rail and buckling it.