Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
How can you ‘green light’ it if you don’t know a) what you are green lighting and b) how much it is going to cost?
Well the first green light would be to work that out! That’s why it takes long enough that you don’t need to worry when Bristol East will be finished (I assume that has a frozen spec by now??)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
Well the first green light would be to work that out! That’s why it takes long enough that you don’t need to worry when Bristol East will be finished (I assume that has a frozen spec by now??)

Ah, well that’s a different green light. And of course only a green light to the next set of traffic lights, ie to do the working out. But hopefully that will come soon.

And yes the scope of Bristol East is long since frozen, albeit design is ongoing (and yes, it is electrification compatible).
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Ah, well that’s a different green light. And of course only a green light to the next set of traffic lights, ie to do the working out. But hopefully that will come soon.

And yes the scope of Bristol East is long since frozen, albeit design is ongoing (and yes, it is electrification compatible).
I presume it’s a relatively easy stage as the work was done previously - just a case of dusting off the file and checking none of the assumptions have changed? Or is the GW metalwork so disgraced as a concept that it all needs reworking for the later/better versions?
Does it need any new feeds or other such long lead items?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
I presume it’s a relatively easy stage as the work was done previously - just a case of dusting off the file and checking none of the assumptions have changed? Or is the GW metalwork so disgraced as a concept that it all needs reworking for the later/better versions?
Does it need any new feeds or other such long lead items?

I’m not sure the work has been done previously, at least not in detail. I may be wrong. In any event, it would certainly need a full design review.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,277
Does it need any new feeds or other such long lead items?
It shouldn’t do, the long-standing information about grid feeder locations (in the main GW wiring thread somewhere) explained that the Thingley Junction feeder will basically cover the route via Bath and as far as Bristol Temple Meads. I don’t think there was any detail about the normal electrification boundary location in the Bristol area, ie where the separation between Thingley and Cardiff would be.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
I’m not sure the work has been done previously, at least not in detail. I may be wrong. In any event, it would certainly need a full design review.
Did all the overbridges get fixed during the quadrupling?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
I’m not sure the work has been done previously, at least not in detail. I may be wrong. In any event, it would certainly need a full design review.

It'll need a significant design review in any case thanks to the sale of 'surplus' electrification steelwork and the drift from Series 1 to UK Master Series (specifically the upgraded Series 2 system).

What was going to hold up the wires previously almost certainly won't be what is going to hold them up in the future. I say that as a Series 1 fan, but as the mantra remains mechanically independent registration, I can certainly live with that.
 