Ted172
Member
Would it be likely for GA to refurbish the 379s to the same standard of the 745s?
I would say so.Would it be likely for GA to refurbish the 379s to the same standard of the 745s?
It always struck me as strange putting crown point based stock so far from the depot. If a 745 failed at Stansted its a hell of a trek back to crown point to swap a unit or something.The 317s will get a PRM extension, it's a formality. If GA were going to use 745s on the WAML they would have started testing weeks ago.
Exactly, another clue that they were never going to be used on the Stansteds. But hey ho it helped Abelio win the franchise.
Hmm sounds a bit dubious tbh, I doubt the original plan was a ruse.Exactly, another clue that they were never going to be used on the Stansteds. But hey ho it helped Abelio win the franchise.
Out of interest, Does Stansted Express regularly gets overcrowded to justify on removing 1st class?if they're to be kept, I'd hope they'll be at least refurbed to remove 1st class as per the franchise plan, to improve capacity.
Surely if they keep the 379s and move all the 745s to the Great Eastern Express services they'll have far too many units? And the economics of the whole fleet replacement programme (which included dumping the expensive 379s) will completely collapse?
Surely if they keep the 379s and move all the 745s to the Great Eastern Express services they'll have far too many units? And the economics of the whole fleet replacement programme (which included dumping the expensive 379s) will completely collapse?
It obviously wasn't the original plan! But that's how it has turned out. First class will go on the 379s, the 745s on the Stansteds wouldn't have had it anyway so it won't be a loss. Look out for a new livery on the 379s to match the 745/755s too.Hmm sounds a bit dubious tbh, I doubt the original plan was a ruse.
*edit* this post was my 379th. Illuminati confirmed.
As I said on the 745 thread, 745s will not be used on the Stansteds , one of the many reasons being they won't fit through Hackney Downs platform. Rest assured the 379s won't be going anywhere
If 745s can't fit on the West Anglia route, would 720s also struggle as they are also 23m units? Or is it specific to the Stadlers?I think it's fair to say that there have been discussions and legal action between GA and DfT, so it's highly likely that the Franchise Terms have been or are being renegotiated. DfT have an interest in a smooth transition and happy commuters.
As for "too many units", maybe right now but there are huge housing developments planned in Essex so passengers numbers should remain healthy on the GEML. If the 745s are all on GEML then there are a few services that would benefit from longer-distance units for 90 min journeys, including on my local Clacton branch (a 755 was spotted on there recently by a forum member).
So 3 x 745/1 to compliment the 745/0 units on Norwich Services.
1 x 745/1 for the Peak Norwich stopper.
1 x 745/1 for the Harwich Boat Train.
4 x 745/1 for branded GA Express Commuter Services (2 from Ipswich/2 from Clacton maybe)
1 x 745/1 contingency
Releases 9 720/1s for Southend Victoria/Cambridge peak services. Alternatively, 6 of them could go to C2C on loan or for driver training before their own 10 car units arrive.
Edit: I should add that GA did say that they expected 720s would operate on some Stansted Express services.
Wild stabs in the dark there, of course.
Stadlers are (semi) articulated.If 745s can't fit on the West Anglia route, would 720s also struggle as they are also 23m units? Or is it specific to the Stadlers?
There might be housing developments planned, but it's hardly the intention to order units now so that in 10 years time they'll be able to cope with the extra demand. Especially when other parts of the country are crying out for more capacity...
As I said on the 745 thread, 745s will not be used on the Stansteds , one of the many reasons being they won't fit through Hackney Downs platform. Rest assured the 379s won't be going anywhere
I doubt it's true, I'd want to see confirmation from people that work in the area before I give it too much thought. I'm prepared to believe the 379s will stay put, but I'm not buying the 745/1s not being used on StanEx just yet.Can I just get this right (as it's news to me) GA have ordered 10 trains that aren't within gauge for the specific route they were intended?
If so that's got to be one of the biggest Railway Blunders in memory.
Except 1st Class is due to be abolished on Stansted Express.If they're gonna be used on Stansted services they should probably retain the 2+1 1st class. Otherwise they will end up with something like the joke Gatwick Express passes off as "1st class".
But Gatwick Express only serves the Airport (with some extensions to Brighton) where as the Stansted Express also is used by passengers making shorter journeys in to London.If they're gonna be used on Stansted services they should probably retain the 2+1 1st class. Otherwise they will end up with something like the joke Gatwick Express passes off as "1st class".
Some extensions? It’s the principal Brighton-London fast service running every half hour. As usual, the concept of an Airport Express has been forgotten: to provide a dedicated service that separates airport traffic (with its requirement for luggage space etc) from commuter flows that need to prioritise seating capacity. BR understood that, but the lessons have been forgotten by the MDTR.But Gatwick Express only serves the Airport (with some extensions to Brighton) where as the Stansted Express also is used by passengers making shorter journeys in to London.
So 3 x 745/1 to compliment the 745/0 units on Norwich Services.
1 x 745/1 for the Peak Norwich stopper.
1 x 745/1 for the Harwich Boat Train.
4 x 745/1 for branded GA Express Commuter Services (2 from Ipswich/2 from Clacton maybe)
1 x 745/1 contingency
Releases 9 720/1s for Southend Victoria/Cambridge peak services. Alternatively, 6 of them could go to C2C on loan or for driver training before their own 10 car units arrive.
Edit: I should add that GA did say that they expected 720s would operate on some Stansted Express services.
Wild stabs in the dark there, of course.
When I said some extensions I was thinking of the half hourly service, but the point I was making was that between Gatwick and Victoria it is non stop to Victoria where as the Stansted Express (only slightly further from London) has a number of stops between the Airport and London.Some extensions? It’s the principal Brighton-London fast service running every half hour. As usual, the concept of an Airport Express has been forgotten: to provide a dedicated service that separates airport traffic (with its requirement for luggage space etc) from commuter flows that need to prioritise seating capacity. BR understood that, but the lessons have been forgotten by the MDTR.
It’s just one of the many joys of the privatised railway.