There has been much wondering online about why the above apparently obvious solution isn’t happening, to relieve congestion. Or combine Voyagers into longer trains and adopt some redundant HSTs.

What I haven’t read about is the reasons why it’s not done. What are the practical obstacles to such a plan?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Prisoner

Member
Joined
22 Aug 2012
Messages
423
I’m not an expert, but I assume the mark IIIs in storage are mostly not PRM compliant and/or goosed?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,326
Location
Glasgow
There has been much wondering online about why the above apparently obvious solution isn’t happening, to relieve congestion. Or combine Voyagers into longer trains and adopt some redundant HSTs.

What I haven’t read about is the reasons why it’s not done. What are the practical obstacles to such a plan?

Any stored Mk3s would need fitting with sliding doors as with XC's other Mk3 trailers. If you introduced full sets, then you'd need to fit them with PRM-compliant toilets and so on as well.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,574
Location
Macclesfield
Mark 3s need to be fitted with powered doors and a range of other modifications to make them disability compliant in order to continue operating. Wabtec are the only ones undertaking such work and are currently fully committed to upgrading mark 3s to this standard for Crosscountry, Scotrail and GWR. It takes around 4 months to convert a 7-car HST set.

Long HSTs have poorer performance characteristics compared to Voyagers on services timed for the latter.

Taking on additional rolling stock incurs increased leasing, track access and maintenance costs that would affect the premium/subsidy profile of the current direct award franchise agreed with the DfT. In general, short direct award agreements are not conducive to aiding long term rolling stock strategy.
 