The signal you refer to is the signal that controls the double track to single line.
The tunnel you speak about is Brockholes Tunnel.
From the Stocksmoor end of this tunnel the line goes from 1 in 50 to level as far as Shepley Station.
At about 250 yards from Shepley Station, there is the single line going to towards Clayton West Junction where there was a signal box and sidings on both sides of the line. This is where trains normally pass each other.
The single line section is controlled by electronic token less block as far as Penistone.
About 1993 I spent a lot of time on the Penistone Line, altering the track layout of this L and Y Branch.
The line was made into single line from Springwood Jct, at Huddersfield upto Stocksmoor.
Barnsley box and Huddersfield box are the controlling boxes on the line.
I have spent many hours working engineering/passenger trains over this branch in my time on the railway. Relayaing track, dropping stone and pointing trains in all of the tunnels in that area.
I once had to go into the front cab of a DMU from Penistone to Platform 4 at Huddersfield as the driver could not get power from the front unit.
I had to use the communication buzzer in the front unit to signal the driver to go/stop/ slow down .
This is why guards should have route knowledge of the rialway they are working over.
The rule book states. ' Guard where provided is in charge of the train.'
As a point of order, The Kirklees Light Railway runs on the old tackbed down to Clayton West from a spot called Lower Ozzings, and ends just before CW Jct.
I can look out of my kitchen window, and look out onto the track of the KLR coming down the bank to the old CW Station.
Many years ago this line had 2 pits, one at Skelmanthorpe and one at Park Mill. This pit sent 3 trains a day to Elland Power Station. Each train had around 25 loose coupled coal waggons and a brake van.
Alas all now gone.
--- old post above --- --- new post below ---
The signal you refer to is the signal that controls the double track to single line.
The tunnel you speak about is Brockholes Tunnel.
From the Stocksmoor end of this tunnel the line goes from 1 in 50 to level as far as Shepley Station.
At about 250 yards from Shepley Station, there is the single line going to towards Clayton West Junction where there was a signal box and sidings on both sides of the line. This is where trains normally pass each other.
The single line section is controlled by electronic token less block as far as Penistone.
About 1993 I spent a lot of time on the Penistone Line, altering the track layout of this L and Y Branch.
The line was made into single line from Springwood Jct, at Huddersfield upto Stocksmoor.
Barnsley box and Huddersfield box are the controlling boxes on the line.
I have spent many hours working engineering/passenger trains over this branch in my time on the railway. Relayaing track, dropping stone and pointing trains in all of the tunnels in that area.
I once had to go into the front cab of a DMU from Penistone to Platform 4 at Huddersfield as the driver could not get power from the front unit.
I had to use the communication buzzer in the front unit to signal the driver to go/stop/ slow down .
This is why guards should have route knowledge of the rialway they are working over.
The rule book states. ' Guard where provided is in charge of the train.'
As a point of order, The Kirklees Light Railway runs on the old tackbed down to Clayton West from a spot called Lower Ozzings, and ends just before CW Jct.
I can look out of my kitchen window, and look out onto the track of the KLR coming down the bank to the old CW Station.
Many years ago this line had 2 pits, one at Skelmanthorpe and one at Park Mill. This pit sent 3 trains a day to Elland Power Station. Each train had around 25 loose coupled coal waggons and a brake van.
Alas all now gone
--- old post above --- --- new post below ---
The link below will take you to 5 pics. taken today.
Pic 1; gradient profile 250 yards from shepley Station.
Pic2;Looking towards Shepley Station.
Pic3 ; Signal for single line section 400yds from Shepley station, with SPAD indicator under bridge.
PIC 4; Stocksmoor SPAD indicator, looking towards Huddersfield.
PIC5; Stocksmoor station. Left to Barnsley, right to Huddersfield.
http://www.imagebam.com/image/ddab1380632641
--- old post above --- --- new post below ---
The link below will take you to 5 pics. taken today.
Pic 1; gradient profile 250 yards from shepley Station.
Pic2;Looking towards Shepley Station.
Pic3 ; Signal for single line section 400yds from Shepley station, with SPAD indicator under bridge.
PIC 4; Stocksmoor SPAD indicator, looking towards Huddersfield.
PIC5; Stocksmoor station. Left to Barnsley, right to Huddersfield.
http://www.imagebam.com/image/ddab1380632641