More like 75 (ish) years. The first 'Sheba' 4-SUB unit, 4101 was completed in 1941, 84 years ago, and the remainder of these, 4102-4110, in 1944, 82 years ago. The main run of 'Queen Mary' SUBs started in 1946 and finished in 1951, 74 years ago. The compressors were recovered from the last SUBs in service, and these would have been the last ones built (they were being withdrawn from the late 1960s onwards, mainly oldest first).
Except.
It did not work like that.
All BR SR EMU items like that were treated as what we call these days LRU (line replaceable units) with compenent exchange each time any unit went for electrical or mechanical overhaul.
Items like compressors were removed, and replaced with another overhauled one; the EMU did not come out with its same items as i went in with.
The removed item went off to workshops, stripped down, rebuilt, placed in stores, to be used on any EMU. All items rebuilt as new as far as possible irrespective of age. Item placed in stores irrespective of age. Devices supplied new with 1940s Subs would be muddled with those new on 1970s Veps, and so on, across any component of any fleet.
What could be fitted to a Sub at one time could have been in a Vep an v.v., and many times, each time the unit went to m&e overhaul.
It is true when Subs were withdrawn, items like compressors, traction motors, etc were recovered, but those could have originated anywhere in any type of any age. The recovered items all went for overhauls and tipped into the same big pool. What was fitted to a new 455 might have been last fitted to a Sub, but could have originated anywhere, and through time been fitted to any number of different unit types. The 455s themselves went through m&e overhauls and the swaps continued.
Same applied to EE507 motors, with one exception, that I will explain in a bit. From late 4Subs on, EE507s in various types, 507B 507C 507D etc were supplied new. The trainspotting books always listed these letters, but after a few years are incorrect. What happened was when any EE507 motor EMU went to Chart Leacon for e&m overhaul (200000 miles on a Mk6 motor bogie unit, 100000 miles on a Mk4) the motors were removed, overhauled ones fitted. The removed motors went off to the motor shop, the armatures seperated from the carcasses, each overhauled as seperate items, and on completion any armature with any carcass. Each motor overhauled, armature and fields rewound, etc, to the latest spec, then put on a test rig. All such things vsry slightly, the motor shop recorded each motors own characteristics, and matched 4 as close as possible, and those went as a set to stores for the next unit. Does not matter where they came from, supplied new to or taken off a Sub EPB Cig Cep Vep etc did not matter. So you could have older or newer armatures in older or newer carasses, fiited in older or newer units. The only disctinction between all types was 'oiler' or 'roller' for journal or roller bearing motor suspension tubes - these had to match the bogie of the receiving unit. The EE507 motor exception was 456s (and the chopper 455s when they existed). These had
EE507J EE507 motors captive to that class. Often written these EE507 were new from GEC but even those were not. They were ex older EMU recovered and sent to GEC for total rebuild. 456s had thyristor traction packs (half a 319 pack) and their DC pack output is not the same as the DC ripple direct from substations neede to be different. But they could have originated anywhere.