Services may not always “need” their booked time, but are timetabled that way for a multitude of reasons. Trains at Charing Cross have anywhere between 8-25 minutes. Crew have minimum turn around times - dependent on stock length - and therefore this could be less than the booked time.

== Doublepost prevention - post automatically merged: ==



The point is whether it could have run as booked and then terminated at London Bridge and still departed on time, as it made minimal time running fast from Ashford - Paddock Wood. I would suggest yes, but someone would need to take an in depth look at timings and the stopper from Sevenoaks especially or whether that could be held for a couple of minutes. It’s never an exact science
I am fully aware how train services run. However you seem to be of the impression trains will need their booked time at Charing Cross but not at London Bridge. This is clearly nonsense.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fusionblue

Member
Joined
10 May 2012
Messages
329
I don’t see any reason why the PPM would decrease? The entire point of the timetable was to remove conflicting points at Lewisham

What's happened in practice is the conflicting movements has been shifted elsewhere. I've been held up on the approach to and from the Hayes line (I forget the junction name that bypasses Lewisham) at least once daily since the timetable change, in addition to the Tanners Hill flydown waiting for a slot on the up fast to London Bridge.

I still partly lay blame for this to the Thameslink Project, with its big bright marketing of "untangling tracks" but did nothing largely around Lewisham, Hither Green or Denmark Hill to Elephant - while simultaneously introducing the Thameslink Rainham service which now crosses all the Cannon Street tracks to get to Deptford.
 

Edsmith

Member
Joined
21 Dec 2021
Messages
666
Location
Staplehurst
I use Southeastern regularly and generally find them ok and often when problems do happen it's down to the infrastructure and people seem to automatically blame the new timetable.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
What's happened in practice is the conflicting movements has been shifted elsewhere. I've been held up on the approach to and from the Hayes line (I forget the junction name that bypasses Lewisham) at least once daily since the timetable change, in addition to the Tanners Hill flydown waiting for a slot on the up fast to London Bridge.

Parks Brige/Ladywell Loop.

Although not many, I presume that mat have been a slight exaggeration, but there was a debate with 2 MPs from SE London, who weren't too happy about the changes. I can't find the debate itself, but I have bee able to retrieve the transcript, if you want to look.


Fair enough. Some of that criticism is perfectly valid, to be fair. I do think there may also be an element of people blaming the infrastructure issues on the timetable, though.
 

CFRAIL

Member
Joined
17 May 2019
Messages
335
It has seemed inadequate recently, caused by various issues though. Mostly infrastructure, TSR, weather related and not to mention the industrial action too. Most mainline services have seemed okay though but I think metro is suffering.
 

SandsofEss

Member
Joined
11 May 2014
Messages
250
This is a timely thread for me, as I've been wondering whether there's any scope for the new timetable to be adjusted in May.

I commute daily from Marden to Tunbridge Wells. Since the timetable change, connections at Tonbridge are much poorer, particularly on the return leg. At most times of the day, there's now a 22 minute wait baked in, with the exception of a few connections around 18:00 that are 16 minutes.

I get that there are winners and losers with any change (and others are worse off than I am), but I'm now having to leave work thirty minutes earlier than previously in order to make it to other commitments on time. I much prefer to commute by train (and have held an annual season ticket for 24 years), but I'm now seriously considering whether I need to switch to car instead, which pains me to type.

Is there any point in me writing to Southeastern to ask for Tonbridge connections to be improved?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
This is a timely thread for me, as I've been wondering whether there's any scope for the new timetable to be adjusted in May.

I commute daily from Marden to Tunbridge Wells. Since the timetable change, connections at Tonbridge are much poorer, particularly on the return leg. At most times of the day, there's now a 22 minute wait baked in, with the exception of a few connections around 18:00 that are 16 minutes.

I get that there are winners and losers with any change (and others are worse off than I am), but I'm now having to leave work thirty minutes earlier than previously in order to make it to other commitments on time. I much prefer to commute by train (and have held an annual season ticket for 24 years), but I'm now seriously considering whether I need to switch to car instead, which pains me to type.

Is there any point in me writing to Southeastern to ask for Tonbridge connections to be improved?
Any changes suggested now won't take effect for nearly 2 years. SE are required to submit their bid for the base timetable 64 weeks before operation, which means they will be working on it a long time before that.

But still worth writing in, or getting others to support you in doing so. There are various things that can be done through the short-term processes to help.
 

CFRAIL

Member
Joined
17 May 2019
Messages
335
There's certainly a link on southeasternrailway.co.uk that you can click on to provide timetable feedback and hopefully it'll lead to positive changes.
 

Gorlash1886

Member
Joined
17 May 2018
Messages
148
The scenario depicted above which I responded to is not a reversal though the driver would have been instructed to terminate the journey, change ends and start again which would be driving in the correct direction. A reversal by changing ends to move back in the platform would be by definition a wrong direction movement which this was not. Southeastern drivers are not permitted to drive in reverse other than at pre determined locations such as the Strood shunt.



The poster already cleared up what he meant, I posted so people didn't think they were just driving in reverse for fun.
 

BluePenguin

On Moderation
Joined
26 Sep 2016
Messages
1,605
Location
Kent
The scenario depicted above which I responded to is not a reversal though the driver would have been instructed to terminate the journey, change ends and start again which would be driving in the correct direction. A reversal by changing ends to move back in the platform would be by definition a wrong direction movement which this was not. Southeastern drivers are not permitted to drive in reverse other than at pre determined locations such as the Strood shunt.



The poster already cleared up what he meant, I posted so people didn't think they were just driving in reverse for fun.
With respect we were all already singing from the same hymn sheet. I don’t think anybody thought I was talking about the driver putting the train into reverse gear :lol:
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
I am fully aware how train services run. However you seem to be of the impression trains will need their booked time at Charing Cross but not at London Bridge. This is clearly nonsense.

Why? I've explained that there are minimum turnaround times, and not every train is booked to have a minimum turnaround time at a terminus. I appreciate that you could cut into the booked turnaround time to take it to minimum, if that's what's your talking about.
 

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Big problems tonight at London Bridge. Police having to be called due to dangerous crowding.

Many issues at play that are not the fault of south eastern but cutting services is adding to it.

== Doublepost prevention - post automatically merged: ==

I use Southeastern regularly and generally find them ok and often when problems do happen it's down to the infrastructure and people seem to automatically blame the new timetable.

The new timetable exacerbates other issues which have long existed. Those issues will continue to exist, but will now have a worse impact. Police rarely had to close London Bridge and we didn't see the sites of tonight.
 
Last edited:

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
Big problems tonight at London Bridge. Police having to be called due to dangerous crowding.

Many issues at play but SE cutting services is adding to it.

== Doublepost prevention - post automatically merged: ==



The new timetable exacerbates other issues which have long existed. Those issues will continue to exist, but will now have a worse impact. Police rarely had to close London Bridge and we didn't see the sites of tonight.

Tresspasser at Hither Green in the peak.
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,786
Location
South Yorkshire
Why? I've explained that there are minimum turnaround times, and not every train is booked to have a minimum turnaround time at a terminus. I appreciate that you could cut into the booked turnaround time to take it to minimum, if that's what's your talking about.
It's nonsense because you were comparing the booked turnround times at Charing Cross with minimum times at London Bridge.
 