Due to London Bridge rebuilding and seeming lack of planning there's some big capacity cuts coming from January. The line through Greenwich is seeing a third of trains cut and around 20-25% of passenger capacity cut at the busiest evening peak time.
I'm wondering what the effects will be and how quickly extra stock could be received to deal with it? The plan for 377/1 is way too far off and will arrive just before Crossrail is opening and London bridge is completing when the need is diminished.
Basic story is that less trains can run which is fair enough with all the work. Problem is that the remaining trains that do run on the Greenwich line can't be 12 car despite years of work on platforms and power upgrades as 1) SE lack stock 2) Woolwich Dockyard has only 10 car platforms and work not done there, and no trains with SDO have been cascaded to SE. The delayed 700 ordering played a part here I suppose in not freeing up 377s.
The 20-25% of lost passenger capacity has to go somewhere. Its not like the Olympics with travel changes needed for 2 weeks at the quietest period. Most of the lost % are supposed to go via Lewisham and DLR instead, but isn't Lewisham already packed, and can trains on other lines heading between London terminals & Lewisham take many extra using it? Even then, this option is of limited use to most on the line.
Would it have been possible for some 377s with Southern that have SDO to go to SE allowing 12 car and in return some 465/466 go over for the duration to run on southern lines that do not have 12 car but use 377s?
More could go for DLR to Woolwich but isn't that also extremely busy now? Plus that option costs a fair chunk more than a train from Cannon Street.
I see the % that they hope will alter travel as too ambitious to achieve without some pretty severe consequences. This could all have been avoided if SE could have run 12 car trains with SDO. Was there ever any real plans for this?
I'm wondering what the effects will be and how quickly extra stock could be received to deal with it? The plan for 377/1 is way too far off and will arrive just before Crossrail is opening and London bridge is completing when the need is diminished.
Basic story is that less trains can run which is fair enough with all the work. Problem is that the remaining trains that do run on the Greenwich line can't be 12 car despite years of work on platforms and power upgrades as 1) SE lack stock 2) Woolwich Dockyard has only 10 car platforms and work not done there, and no trains with SDO have been cascaded to SE. The delayed 700 ordering played a part here I suppose in not freeing up 377s.
The 20-25% of lost passenger capacity has to go somewhere. Its not like the Olympics with travel changes needed for 2 weeks at the quietest period. Most of the lost % are supposed to go via Lewisham and DLR instead, but isn't Lewisham already packed, and can trains on other lines heading between London terminals & Lewisham take many extra using it? Even then, this option is of limited use to most on the line.
Would it have been possible for some 377s with Southern that have SDO to go to SE allowing 12 car and in return some 465/466 go over for the duration to run on southern lines that do not have 12 car but use 377s?
More could go for DLR to Woolwich but isn't that also extremely busy now? Plus that option costs a fair chunk more than a train from Cannon Street.
I see the % that they hope will alter travel as too ambitious to achieve without some pretty severe consequences. This could all have been avoided if SE could have run 12 car trains with SDO. Was there ever any real plans for this?