...to the scrapman, then it'll be well past time and many commuters will weep tears of joy.Overhaul their livery maybe? Or replace the seating. I grew with these trains in the South East and if they go...
Without turning this into another refurbishment debate, considering they are on the way out anyway and with the current financial situation of the railway, why would they need new seating? The most I can see happening is a very light 'refresh' at that, consisting maybe of a deep clean and some very minor changes, maybe new seat covers if you are lucky. I doubt a new livery would even be done. Bodywork or corrosion related work would make more sense, if they are planning to keep them in service for quite a few more years.Overhaul their livery maybe? Or replace the seating. I grew with these trains in the South East and if they go...
Can't see that it would be economical to repair, especially if you factor in road transport costs. Probably best to swap it with one of the better ones in storage?It was parked up at Bromley North between April and about July, it was then moved inside the shed at Victoria #1 road around August then moved to the wall siding.
Apparently it might have to go by road for repairs, not sure how they’ll get it out or where it’ll go from but the unit has been outside for a good 4 months.
How could a unit be such a failure that it can't run on rails?
That's a decision for Angel, as vehicle owners, not South Eastern. If Angel tell South Eastern to repair it, they'll have to repair it.It has a cracked bolster so likely off to scrap, no reason in repairing it
The bogie mounting. Not something you'd want to find a crack in!What is a bolster?![]()
There was no possibility of conversion back to third rail operation as the equipment had been disposed of.I am rather surprised that Southeastern didn't go for the 365s as they were withdrawn from Great Northern.
All DC current collection equipment (shoe beams, cables, arc shields, fuse boxes etc) were removed during conversion at Doncaster works. One set were retained by Bombardier for possible pattern use at some point in the future but they were lost at Crewe works during the closure. The rest went in the skip. This was done as it was recognised at the time that the odds of 365's ever going back to DC operation were extremely long.
Uniting the 365 fleet made sense in the context of the Great Northern operation. It was deemed more appropriate to bring in 376s to the metro area to release 465s to outer suburban work than procure a new fleet for the outer suburban work and leave 465s where they were. 365s weren't relevant in that consideration.Always amazed me that they got rid of their original allocation of 365s and then later converted a batch of 465s to 465/9s.
I doubt it, they'll want the wall siding back before too long.Could it end up like the Shenfield Shark, being left in situ for decades to come?
I know the capacity of that siding is limited by 465921's presence, but can't a shorter unit formation still fit in there infront of it for overnight stabling, and then make sure anything in the way when 465921 needs moving is out in service? I'm pretty sure the unit still has the rear lights on the cab facing Victoria lit.I doubt it, they'll want the wall siding back before too long.
I imagine it can, hence why it's not been moved yet. It's still 4 cars worth of stabling though, and it might come in very handy when major works are taking place.I know the capacity of that siding is limited by 465921's presence, but can't a shorter unit formation still fit in there infront of it for overnight stabling, and then make sure anything in the way when 465921 needs moving is out in service? I'm pretty sure the unit still has the rear lights on the cab facing Victoria lit.