I just looked at Realtimetrains and although for tomorrow and future days it suggests that Reading trains will use P2 at Barnes, for today most are showing through P1 - maybe they are having a bit of a play with the working timetable...
Thinking about it more overnight, I guess since the modifications to add the Eurostar flyover the designations fast and slow are ineffective as both up and down directions merge for some part of their route between Queenstown Rd and Waterloo. Also, as said Barnes Junction is a major capacity issue which causes the down direction to be operated contrary to description - historically it really should have been grade separated like many other LSWR junctions...
In the future, if the proposals in the London and SE RUS for five tracking of the main side go ahead (i.e. without CR2) then it could leave the 'Windsors' with only 3 tracks all the way between Clapham Jn and Waterloo, which probably accounts for the planned capacity of the Windsor side always being given as much less than the main side.
If they do CR2 will there not be 5 tracks or will 5 tracks simply not be needed as CR2 deals with the passenger issue and less trains will be required.
Could they ever rename the lines or would that be too confusing or not possible because they switch tracks later on?
Talking of lines, I always enjoy telling people that the Guildford New Lines, as I believe the lines via Cobham are still known, were opened in 1891. It gets a laugh.