As for no capacity south of Birmingham International, is there really no spare train paths. In theory it would be similar to how some French TGVs use the interconnection line rather than going into Paris Nord, or Gare de Lyon. Not everyone wants to go to London.
The section south of Interchange is specced for 18tph, of which 17tph are allocated in the Train Service Specification for services to/from Euston plus 1 path "spare" for future growth.