The line is run exclusively by 150s so I'd hope they were compatible!
The one time I saw this done (not on the Penarth line) the rescue train was taken out of passenger service at the stop before it reached the detonator protecting the failed train.
== Doublepost prevention - post automatically merged: ==
Realtimetrains is showing all trains to Penarth and Coryton today as 2 coaches.
So it looks as if the introduction of 756s has been delayed.
There's a test run listed for tomorrow.
Even if the second train was a 150 doesn’t mean it can couple.
Not all is plain to the eye as it may first appear.
== Doublepost prevention - post automatically merged: ==
I think it's been said elsewhere that there are still issues with the wires on the Coryton branch so the plans have moved.
There was a AC test run two weeks ago, then a battery test run last week.
As far as I’m aware the block to electric traction had been removed, but may well of been reinstated.
== Doublepost prevention - post automatically merged: ==
I see on P7 at Cardiff Central an electronic sign saying Aberdare P2. Now, anybody not familiar with Cardiff, on seeing this might go over to the mainline P2 for this train. (What it actually means is that the Aberdare train will finish its journey on P2 at Aberdare. Totally confusing for non regulars)!
Definitely, and pointless at Aberdare - two platforms yards from each other.
All well and good playing the “fugue proof” card but there are other locations crying out for a station in the meantime.