CardiffKid
Member
Similar masts have appeared at Llandaff including some beams with extended arms that have had to be placed further away from the track.
It’s actually happening!
It’s actually happening!
The back-to-back twin cantilevers look more MML than GWML.The masts look very similar to those on the GWML - which were criticised for being ugly and expensive. I thought a less obtrusive design would have been used.
The masts look very similar to those on the GWML - which were criticised for being ugly and expensive. I thought a less obtrusive design would have been used.
These are definitely more MML/NWEP than GWML. The only GWML parts I can foresee being used in the Valleys are the Single Insulator "gooseneck" Cantilevers; these were the preferred choice for use within stations due to their much smaller envelope of live equipment.The back-to-back twin cantilevers look more MML than GWML.
Good to see progress. There's obviously some trick of perspective going on, as they look absolutely enormous in the shot from the footbridge, but as I would expect in the shot from the platformRadyr has had quite the transformation in the last couple of weeks:
Pictures taken 22/08/22: https://flic.kr/p/2nHPHaS, https://flic.kr/p/2nHPH9z
and on 29/08/22: https://flic.kr/p/2nHgAaT
Hats off to the design team for using "back to back" twin-track cantilever masts - thereby keeping the number of foundations down!
Many thanks for the info.These are definitely more MML/NWEP than GWML. The only GWML parts I can foresee being used in the Valleys are the Single Insulator "gooseneck" Cantilevers; these were the preferred choice for use within stations due to their much smaller envelope of live equipment.
IIRC GWEP had to use the same back-to-back TTCs in the East Usk Yard area as the Series 1 range didn't have an equivalent design.
A bit of a history lesson - those TTCs were actually introduced in the late '60s/early '70s with the MkIII/Mk3 range on the Lea Valley, although they had spanwires and a 'nose' at the end to support said spanwire.
They've stayed through the MkIII range and been added to the UK1, Series 2 and UKMS ranges - the only modern change being the non-allocation of the 'nose' - but the bolt holes where the 'nose' would be attached still remain on the drawing.
Talk about a design classic!
I think we probably see the Aberdare branch wired first by the sounds of itHere's a response to an FOI request:
Can you please provide any information about where TfW is currently electrifying on the Metro network (boots on the ground / piling masts)?
TfW are currently installing overhead line electrification (OLE) foundations between the following locations:
o Radyr >> Pontypridd >> Aberdare and Merthyr Tydfil;
o Radyr >> Cardiff Queen Street >> Ninian Park.
Installation of OLE masts and wiring is progressing between the following locations:
o Abercynon >> Merthyr Tydfil.
Enabling works are underway are the following locations:
o Pontypridd >> Treherbert;
o Cardiff Queen Street >> Rhymney (inclusive of the Coryton branch);
with foundation installation due to start imminently on these sections.
There will be discontinuous electrification within the routes mentioned. The first energisation is planned for August 2023, whilst later works are being re-phased to ensure the most efficient planning and delivery of these works across all disciplines involved. As such, timescales beyond August 2023 are not available at present.
First C&C wires are up in R2P Route Section (Sunday 18/9) and second wire run going up today on the Valley Lines with beautiful weather!
Well done to the CVL engineering and construction teams!!
![]()
![]()
![]()
Big news. Big. HUGE.
The first Catenary & Contact wires have gone up, somewhere between Radyr & Pontypridd (looks to be just after the line crosses the Taff north of Taff's Well). https://www.linkedin.com/posts/rich...Wo?utm_source=share&utm_medium=member_desktop
At each Permanently Earthed Section, the wires are physically going beneath every affected bridge. My assumption is that if there needs to be a reconstruction, the PES in question could be removed.A wonderful sight, again it’s just a shame a proper full fat system couldn’t of been pushed forward instead of the cut price budget scheme we’re getting.
To a budget springs to mind, look how that worked out on the Docklands Light Railway years of catch up behind increasing passenger numbers.
I had heard (I forget where) that due to the amount of work planned to be done between Porth and Treherbert (electrification, new platform for Treherbert, abolition of the EKST signalling system, etc.) it was planned to have a blockade of considerable length on that section of line. The last I heard was that the block was planned to start before the end of this year - I don't know if that will be the case - and last at least between 4 and 6 months. If such a blocklade is indeed going to happen then I guess any work at the top end of the Rhondda Valley will be done then.Finally it was up the Rhondda Valley, which in contrast was a real disappointment. I didn't spot any earthworks or electrification work anywhere on either side of the line.
It's quite remarkable to think that in a couple of years there will be 8 electric services an hour between Abercynon and Pontypridd, whereas wind back 40 years and there was just the one.
Some of the 1970s timetables had only 1 per hour between Pontypridd and Cardiff. Usually a 6 car set which split at Pontypridd for Merthyr and Treherbert.Fair point! Should have said one diesel service (which at the nadir of the Valley Lines service turned around at Abercynon on alternate hours).
The 1973 timetable shows around 38 weekday services in each direction between Cardiff and Pontypridd.Some of the 1970s timetables had only 1 per hour between Pontypridd and Cardiff. Usually a 6 car set which split at Pontypridd for Merthyr and Treherbert.

Brilliant to see this timetable. It reminded me that Cathays station is relatively recent, opening in 1983.Like this (from the May 69 to May 70 timetable). Sorry I've cut off the Rhondda branch timings, but you can just see a Trehafod call at the top right, showing that the two services joined at Pontypridd.
20 mins from Pontypridd seems very attractive, but bad luck if you wanted to go from (say) Abercynon to Treforest - 44 mins!
View attachment 121268
It would be nice for them to actually tell people if that is the plan! (and god help the chaos that will cause based on last weeks Cardiff - Pontypridd replacement buses).I had heard (I forget where) that due to the amount of work planned to be done between Porth and Treherbert (electrification, new platform for Treherbert, abolition of the EKST signalling system, etc.) it was planned to have a blockade of considerable length on that section of line. The last I heard was that the block was planned to start before the end of this year - I don't know if that will be the case - and last at least between 4 and 6 months. If such a blocklade is indeed going to happen then I guess any work at the top end of the Rhondda Valley will be done then.
Dave
Also Cefn On hadn't been replaced by Lisvane and Thornhill and Coryton trains ran to Bute Road - something that's been revived for some of the 'Covid' timetables.Brilliant to see this timetable. It reminded me that Cathays station is relatively recent, opening in 1983.
…and Cardiff Central still called General…Brilliant to see this timetable. It reminded me that Cathays station is relatively recent, opening in 1983.
I was thinking how it looks like it's finally coming togetherTwo photos of the Taff’s Well depot from the south-east. Looks well behind schedule.
Apart from the City Line and the Cynon Valley branch and the Vale of Glamorgan route, there are a few other stations that didn't exist then. The transformation over the last 40 years of the lines radiating from Cardiff has been remarkable, even before the current improvements.