Envoy
Established Member
- Joined
- 29 Aug 2014
- Messages
- 3,142
The Hitachi depot in Swansea did have catenery put up (minus the wires I think) but it was removed when electrification through to Swansea was cancelled.I can't see why they couldn't justify it though, if these lines were electrified GWR could have ordered electric only units and could have done away with deisel altogether on this route, and considering the hitachi depot is based in Swansea it seems a bit stupid trains leaving the depot on electric then switching to diesel when they hit the mainline until Cardiff then back to electric.
Completely agree it ahould definitely be revisited now, but has this section of the line been passed to welsh government or is it still under network rail and dft? Because I'm sure welsh gov and amey would have a fight on there hands trying to get dft to agree to it.
The UK government had ordered about 50%? of the Class 800 fleet to be electric only but with one coach having a diesel engine for emergency use. It was Network Rail failing to deliver on time and to budget that then forced the UK government to pay more money to Hitcahi to make the whole fleet bi-mode. This of course means increased maintenance costs.
This failure to deliver on time & to budget by Network Rail then led to the UK government having to curtail the mainline electrification between Cardiff & Swansea. Had that happened, it would have meant that we could have had an electric stopping service on the mainline - possible running between Swansea & Bristol Temple Meads/Bath. Throw in the relatively short Bridgend to Maesteg line being wired along with the line to Ebbw Vale & we could have seen yet another all electric service serving the south Wales Metro area. The Glamorgan Coast Line via Llantwit Major & Barry might also have been wired as this is used as a diversionary route for the London trains.
I am not sure if having Swansea to Newport wired along with the Crewe to Manchester line already being electrified would have led to a bi-mode order for trains that use The Marches route. As this stand, we have a large order for the Class 197 diesel trains from CAF to serve most of the long distance TfW routes.