Why is it too much effort to build new, or re-open old railway infrastructure, but building new roads, local govt won't hesitate to buy up the land and property needed to make it happen? Apart from some industrial units immediately after Penarth station and the houses on Birch Lane/Rowan Close, rebuilding the line to Sully should be relatively straightforward.
Unfortunately, buying up some built on land and property to rebuild rail lines and undo the extremely bad and ill thought out decisions of the 1960s is inevitable. Or we will simply need to live with increasingly unmanagable and unsustainable traffic congestion.
It is frustrating that all of the focus of the Metro is on the Valleys, when this route is also desperately needed, but because it's in the affluent Vale of Glamorgan, it's being overlooked.
The Vale is being ignored though, it's getting new Stadler Flirts and that's it. The only service enhancement is 2 tph between Barry and Bridgend in 2024.I get your frustration but it's a bit unfair to claim the focus of the Metro is on the valleys. Inevitably, the current phase of the Metro project is focused on improving services on lines that already exist. The only new strech of line won't be in the valleys at all. It will be in Cardiff Bay
As for the Vale being ignored, it's a marginal seat in both the Assembly and HoC so there's a strong poltical reason to improve services there. It's more difficult to do that though on the parts of the network that are owned by Network Rail.
You are conveniently ignoring the utter mess they have made of everything devolved so far!Network Rail should be fully devolved to the Welsh Govt in Wales
Except for making joined-up national decisions for rail lines that cross the arbitrary England/Wales border!it makes no sense for the DfT and Westminster to control NR in Wales
You are conveniently ignoring the utter mess they have made of everything devolved so far!
Apart from CASR, which was a much needed signalling renewal and upgrade combined, and electrification to Cardiff, please list all of the transformational infrastructure upgrades there have been to rail infrastructure in Wales since privatisation, under the direction of Westminster and the DfT.Except for making joined-up national decisions for rail lines that cross the arbitrary England/Wales border!
Being a Labour voter means one cannot read league tables?Well that point is debate-able, depending on your political leaning. I'm guessing you're not a Labour voter.
You are the one proposing the change - what do you think the WAG would do, and more importantly how would they fund it? These are the people that spent £113 million debating a road, got told it was value for money and the only solution to traffic congestion by an independent enquiry and then did nothing. They bought an airport for much more than the asking price and have done nothing with it. They are hardly A* candidates in the field of transport projects are they?Apart from CASR, which was a much needed signalling renewal and upgrade combined, and electrification to Cardiff, please list all of the transformational infrastructure upgrades there have been to rail infrastructure in Wales since privatisation, under the direction of Westminster and the DfT.
By being having the relevant funding for Network Rail in Wales transferred by Westminster and included in the annual block Grant, just as in Scotland.Being a Labour voter means one cannot read league tables?
You are the one proposing the change - what do you think the WAG would do, and more importantly how would they fund it?
That they politicised. It was supposed to run to Newport, remember? They have messed up the redoubling by telling NR to down tools. What is happening now?The Ebbw Vale line re-opening was again a Welsh Govt funded project.
That they politicised. It was supposed to run to Newport, remember? They have messed up the redoubling by telling NR to down tools. What is happening now?
Being a Labour voter means one cannot read league tables?
You are the one proposing the change - what do you think the WAG would do, and more importantly how would they fund it? These are the people that spent £113 million debating a road, got told it was value for money and the only solution to traffic congestion by an independent enquiry and then did nothing. They bought an airport for much more than the asking price and have done nothing with it. They are hardly A* candidates in the field of transport projects are they?
Well that point is debate-able, depending on your political leaning. I'm guessing you're not a Labour voter.
Apart from CASR, which was a much needed signalling renewal and upgrade combined, and electrification to Cardiff, please list all of the transformational infrastructure upgrades there have been to rail infrastructure in Wales since privatisation, under the direction of Westminster and the DfT.
Also please list the future transformational infrastructure upgrades that Network Rail plans for Wales in future, again under the direction of Westminster and the DfT. Bare in mind that the South Wales Metro and Valley lines upgrades are Welsh Government projects.
I had no idea about this! When was this done? Is there any more information online or anywhere about this?The line was deliberately made almost useless by splitting the service into two separate services with two sets of buffer stops in the platform at Penarth making it impossible for trains to run through towards Barry or Cardiff. A limited service, which didn't connect with anything, then ran between Cadoxton and Penarth. A stupid planned closure of a through route.
That's why I haven't take the bait and responded to arguments about the M4. I easily could and this thread could just turn into an M4 road vs rail debate thread. This isn't the place for that."I don't particularly want to get into arguments about the M4 or the track record of the Welsh Government."
I have no ability to answer the question (as I have no role in moderation), but would suggest that you ask the question directly of a moderator, with the "Contact Us" envelope button at the bottom of the page.Just a question. How does moderation on this site work?
I have posted a reasoned point here twice and find that "This message is awaiting moderator approval, and is invisible to normal visitors."
Fair enough. I'm a reasonably new member of the forum and I understand the moderators are unpaid but why are uncontencious posts blocked at random?
I will try and add the post as an edit.
"I don't particularly want to get into arguements about the M4 or the track record of the Welsh Government."
And after that I fail, being warned about 'spam like content'. What on earth is going on?
Kindly asked.
The new housing would be built near Cosmeston Lakes Country Park in the Vale of Glamorgan on Welsh Government-owned land stretching from Lavernock Road to the coast.
I see that the Welsh Government are now hoping to have new homes built on land they own near Cosmeston Country Park, Penarth. With the roads in grid-lock, perhaps this should now mean the Metro getting extended along the former railway line - though what to do with the few houses blocking the route?
https://www.walesonline.co.uk/news/local-news/cosmeston-country-park-vale-housing-16948763
Citylinks are supposed to be running on the City Line at least which will have to use NR infrastructure through Cardiff Central, albeit on battery power.Goodness knows whether Network Rail would let the tram-trains run on their lines in future?
Citylinks are supposed to be running on the City Line at least which will have to use NR infrastructure through Cardiff Central, albeit on battery power.
Arguably, politics apart, the Citylinks would be more suited to Penarth / Barry Island and the Flirts to the longer Treherbert/Aberdare/Merthyr lines.
But it's all been decided now anyway.
Apologies if this has been covered in the previous 90 pages.........
What is the expected time difference of tram vs train for something like Cardiff Central to Treherbert or Merthyr ?
Thanks.