Envoy
Established Member
- Joined
- 29 Aug 2014
- Messages
- 3,142
I have just posted this on the Great Western Electrification thread:>
You would think that the Welsh Government/Transport for Wales and Network Rail could have co-operated over this matter to save costs/disruption.
See post 8598:>https://www.railforums.co.uk/threads/great-western-electrification-progress.83452/page-287
I see that the masts and horizontal beams have now been inserted on platform 4 at Cardiff Central. Surely, it would have made sense for the horizontal beams to have been long enough to also cover the neighbouring Platform 6 as it is the intention to have the south Wales Valleys lines electrified to 25Kv? So, it looks like that when the local lines are electrified that money will be wasted having to put masts up on Platform 6 instead of just using those now in place on Platform 4.
You would think that the Welsh Government/Transport for Wales and Network Rail could have co-operated over this matter to save costs/disruption.
See post 8598:>https://www.railforums.co.uk/threads/great-western-electrification-progress.83452/page-287