No thats a summary, the actual HLOS is embargoed until 10:30 after the PM and deputy PM give their speech.
No, the link is to the 20 page HLOS. It was live at 0800.
3. This Railways Act 2005 Statement fulfils the requirements of UK legislation1 by setting out for the Office of Rail Regulation (ORR) the information about:
o what the Secretary of State wants to be achieved by railway activities during the review period covering 1 April 2014 to 31 March 20192 (the High Level Output Specification or HLOS); and
o the public funds that are or are likely to be available to secure delivery (the Statement of Funds Available or SoFA).
No way is it a summary.
One ommision however seems to be the freight-only bits. In particular, I think (not too sure on this one though) the section beyond Aberdare is only used by trains to a point on the Vale Of Glam. line, so would otherwise be under the new wires all the way. However, there's no wires to Cheltenham so it looks like they haven't given up trying to force the train WNXX calls the 'poo tube' on us.