So i have read a lot about capacity issues at Leeds and with NPR and HS2 i suspect this will get worse with a study on to how HS2 should approach on the eastern side. Anyway, what solutions could be done to:

1) how hs2 can approach Leeds from the south
2) capacity increases to accommodate NPR and HS2 services from the west
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,187
Location
Bolton
The only obvious thing that can be done to expand capacity at Leeds following the conclusion of recent works is to extend platform 17 to accommodate at least 6 coaches. This would allow three and four car sets to work from Leeds via Barnsley.

After that we're into the territory of acquiring significant land and having to do a total re-locking of the signalling from the ground up.

The alternative is 'virtual capacity increase' which the IRP hints at. This is where new capacity is created elsewhere, releasing space af Leeds. The thought is that a West Yorkshire Metro might be able to take some of the existing commuter routes. However the idea that this might actually be more cost effective is quite uncertain.
 

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
The only obvious thing that can be done to expand capacity at Leeds following the conclusion of recent works is to extend platform 17 to accommodate at least 6 coaches. This would allow three and four car sets to work from Leeds via Barnsley.

After that we're into the territory of acquiring significant land and having to do a total re-locking of the signalling from the ground up.

The alternative is 'virtual capacity increase' which the IRP hints at. This is where new capacity is created elsewhere, releasing space af Leeds. The thought is that a West Yorkshire Metro might be able to take some of the existing commuter routes. However the idea that this might actually be more cost effective is quite uncertain.

Ok how do we create virtual capacity??? New station somewhere if so where or what
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,187
Location
Bolton
Ok how do we create virtual capacity??? New station somewhere if so where or what
A tramway through the streets of the city with heavy rail services replaced by tram-trains, or a tunnel under the centre with some trains diverted into the tunnels to a destination on the other side.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,928
Location
Airedale

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,846
The only obvious thing that can be done to expand capacity at Leeds following the conclusion of recent works is to extend platform 17 to accommodate at least 6 coaches.
I have heard that platform 17 is in the plan to be extended (particularly to allow longer Nottingham services). Not due for completion until Dec 2024 though.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,699
Location
Leeds
Build the T-station platforms as planned. Run terminating services from Sheffield, Knottingley, Doncaster and London into it. That will allow for longer trains to Castleford and Barnsley, and free up P17 and a few paths per hour through West End.

Yes, you'd have to build track but you'd have had to do that if HS2 was built as planned. New track would be need to connect the Stourton/Freighliner area to the ECML line at Outwood. Journey times would be faster though as you'd be cutting the corner on both routes.

Or just extend P17 a bit, as it's cheaper and quicker to deliver ;)
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
Re-timetable things to be as platform efficient as possible. Move as many stoppers onto P0-6 as possible and repurpose through platforms 9, 11 and 12 for any non-NPR through services. If HS2 comes along have a joint terminus at a T, shared with the slow stuff via Woodlesford (4 track approach ideally)
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,187
Location
Bolton
I have heard that platform 17 is in the plan to be extended (particularly to allow longer Nottingham services). Not due for completion until Dec 2024 though.
I've heard so 'on the grapevine' but I don't know if that's written down anywhere or if it's actually confirmed. But if it is, then of course that's great news. I wouldn't have expected it to be sooner than that anyway to be honest.

== Doublepost prevention - post automatically merged: ==

Re-timetable things to be as platform efficient as possible. Move as many stoppers onto P0-6 as possible and repurpose through platforms 9, 11 and 12 for any non-NPR through services. If HS2 comes along have a joint terminus at a T, shared with the slow stuff via Woodlesford (4 track approach ideally)
Arguably this is sort of what was planned to be happening anyway following the new layout and allowing for the longer formations.
 

matacaster

On Moderation
Joined
19 Jan 2013
Messages
1,646
Location
Huddersfield
How about having a mezzanine deck at Leeds? The Bradford exchange line could run on a short viaduct over existing tracks as could some of the Wakefield lines. This would actually rexsult in a fairly level track. OK, costly to build mezzanine deck (and new roof) as river and canal beneath, but a rather elegant solution nonetheless, I feel .
 

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
How about having a mezzanine deck at Leeds? The Bradford exchange line could run on a short viaduct over existing tracks as could some of the Wakefield lines. This would actually rexsult in a fairly level track. OK, costly to build mezzanine deck (and new roof) as river and canal beneath, but a rather elegant solution nonetheless, I feel .

Too expensive and complicated
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,847
There's a decent amount of room for terminating platforms between Platform 0 and the river. 6 through-platforms should be sufficient provided the capacity issues east of Leeds are resolved.

The options for transferring lines over to tram-train and running them through the city streets seem limited. Realistically the only lines you could do this for are Harrogate and possibly Castleford - other lines are too regional (e.g. Calder Valley) or too fast (e.g. Airedale) for tram-train.
 

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
There's a decent amount of room for terminating platforms between Platform 0 and the river. 6 through-platforms should be sufficient provided the capacity issues east of Leeds are resolved.

The options for transferring lines over to tram-train and running them through the city streets seem limited. Realistically the only lines you could do this for are Harrogate and possibly Castleford - other lines are too regional (e.g. Calder Valley) or too fast (e.g. Airedale) for tram-train.

Interesting i did think that but how do you solve the issues east of Leeds? West of Leeds has room for bay platforms but there isnt room for 6 through platforms is there?
 

class 9

Member
Joined
18 Nov 2010
Messages
1,072
Interesting i did think that but how do you solve the issues east of Leeds? West of Leeds has room for bay platforms but there isnt room for 6 through platforms is there?
There's already 6 through platforms, there is potential to connect 13 and 14 bay platforms to create 1 more through line, but the only waiting room/toilets/ shop on that side of the station is in the way!
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,847
Interesting i did think that but how do you solve the issues east of Leeds? West of Leeds has room for bay platforms but there isnt room for 6 through platforms is there?
More tracks, at least long enough for a dynamic loop to allow overtaking. The alignment has space for this between Marsh Lane and Garforth. You would probably need a fancy signalling system between Marsh Lane and the station in order to maximise capacity. Once that's done you're probably looking at capacity for 12-14 trains per hour east of Leeds. Easily enough for the current 6 through platforms to cope.
 

TheBigD

Established Member
Joined
19 Nov 2008
Messages
2,043
Regarding a dynamic loop, what's the minimum distance to allow one train to pass another without either of them being slowed/stopped?
I know linespeed would make a difference but a rough guess would be?
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,847
Regarding a dynamic loop, what's the minimum distance to allow one train to pass another without either of them being slowed/stopped?
I know linespeed would make a difference but a rough guess would be?
Based on the proposals for the Huddersfield line, about 7 miles.

Essentially the slow train enters the dynamic loop about 3 minutes in front of the fast train and comes out of it about 3 minutes behind the fast train. So the fast train needs to gain 6 minutes over the slow. Differential speed is therefore the key. Obviously it helps if the slow train has stations to stop at.
 
Last edited:

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,928
Location
Airedale
Regarding a dynamic loop, what's the minimum distance to allow one train to pass another without either of them being slowed/stopped?
I know linespeed would make a difference but a rough guess would be?
Two station stops on the overtaken train.
 