I've heard two reasons why the BML was naff today. One came from a passenger, the other from other staff. One reason was a :roll: the other a 
But it all stemmed from the engineering works over the weekend between Brighton and Three Bridges. With no trains able to run, the lines and third rail was a bit iced up. This should have been cleaned ready for service on monday, it was not, possible due to :roll: or
Tonight we have the de icers out, the ghost trains and the 73 all running around and I've just come back from vic with minimal delay (23.32 Vic to Btn) so fingers crossed.
As the the WLL there were power supply issues. Not sure where, but there are parts that only southern work (eg the change over section) so might have been there. I had the info, but that was 130 emails ago.
But it all stemmed from the engineering works over the weekend between Brighton and Three Bridges. With no trains able to run, the lines and third rail was a bit iced up. This should have been cleaned ready for service on monday, it was not, possible due to :roll: or
Tonight we have the de icers out, the ghost trains and the 73 all running around and I've just come back from vic with minimal delay (23.32 Vic to Btn) so fingers crossed.
As the the WLL there were power supply issues. Not sure where, but there are parts that only southern work (eg the change over section) so might have been there. I had the info, but that was 130 emails ago.