not by much - i doubt the impact/delay costs outweigh the construction costs.
Then perhaps there is the possibility of reducing maintenance costs by removing a superfluous flat junction over the ECML that would not be needed otherwise.
You coudl remove atleast four sets of points even if you left everything else in the place to allow access to the sidings in the area and to provide single line capability for use during disruption.
Also could pull up two thirds of a mile of track and either remove or stop maintenance on a twin track overbridge.
As the sidings in the area appear largely abandoned the rationalisation would be able to remove them as well and possibly some of the crossovers.
As to the operational disadvantages of this: increased use of an existing level crossing which frankly is a minor problem and it would also require trains approaching on the route from the North to run as far as as Thirsk on the slow.... at 80 (SP90) instead of at 100 (since they will never get 125mph stock this doesn't seem to be a problem really).