Thanks for the info!

I make it 38 bridges, but the A55 is high enough to not need raising (not sure about the other bridges). Many of these are footbridges though and wouldn't necessarily need rebuilding, merely replacement with a (relatively cheap) footbridge.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
Can a mod please edit my terrible typo in the title? :oops:

EDIT: Nevermind, crisis averted.
 
Last edited:

jamess

Member
Joined
24 Jul 2011
Messages
114
None of those will happen in CP6, Cov Leamington dualling is too expensive and the proposal is only south of Kenilworth initially. Crewe Chester is unlikely before we resignal it and that keeps getting deffered. Not sure what Nuneaton Coventry would achieve either.

When is Crewe- Chester signalling now deferred until? Is it just Steele Works and Beeston Castle to go, or will some IB's be added in between the two?
 

Spod

Member
Joined
28 May 2016
Messages
62
Location
Leeds
York to Leeds (Colton Junction to Neville Hill I think it is) and perhaps the Hambleton Curve would seem to be a decent infill scheme (pending full completion of the trans-pennine wiring, whenever that maybe - my crystal ball cannot see that far ahead!).

The transpennine upgrade project already includes wiring York to Leeds. Due to finish around 2022, complete plan incorporating whatever HS3/NPR turns out to be is due this autumn.
 