WideRanger
Member
- Joined
- 15 Jun 2016
- Messages
- 396
In some threads there has been speculation about how long the GWR sleeper sets will last. And I'm struck that the only remaining regular sleeper sets in Japan (the 285 series EMU) are entering the final phase of their working life. Given that the loading gauge for JR and the UK is similar (albeit with different track gauges), would it make sense for a design to be developed that could be easily adapted for deployment on both systems?
Assuming the end of life for current stock in both countries doesn't result simply in stopping the services, given their unprofitability...
Assuming the end of life for current stock in both countries doesn't result simply in stopping the services, given their unprofitability...