Crossforth
Established Member
I read on another forum that some DBS class 90s are going to be exported to Holland, how much truth is there in this?

So there are plenty of MK2s lying about and what now seems to be several class 90s lying about and we have stock shortages yet we're flogging them abroad?
Something wrong I think
Fair point, I can't think of many.
May only free up one possibly two units this but...:
use the 90+stock on an LM 350 service, shift the 350 to the Lymington branch and move the 158/159 elsewhere say to Northern
I am sure there are plenty of others, we just can't think of them
90s + coaching stock
New St - Edinburgh/Glasgow - Good Idea, but could they keep to timings?
East coast HSTs on Leeds diagrams - I doubt they'd keep to timings, and I think the HSTs that are on Leeds runs are required for positioning like Aberdeen HST and extended runs from Skipton etc
90s + coaching stock
New St - Edinburgh/Glasgow
East coast HSTs on Leeds diagrams
I knew there was somewhere obvious I was missing
And I don't think many people would mind having a slightly longer journey if they got to sit down, which quite often does not happen during peak our on TPE services, the amount of times I have had to stand all the way to Manchester from Leeds because we are packed in like sardines
I just don't see the point of exporting stock when we seem to need it here, be that it slows a few journeys down, we do need the extra capacity
I just don't see the point of exporting stock when we seem to need it here, be that it slows a few journeys down, we do need the extra capacity
We have no real use for the 90s right now.
We could recast the ECML/ WCML timetables to allow slower running, which would slow the 225s/ 390s (etc) down, cause connections to be missed, cause more 225s/ 390s (etc) to be needed to meet the same number of services, which is going to be pretty complicated to arrange for the sake of a handful of extra trains.
Also, bear in mind that the Mark Two coaches mentioned above as being "spare" are 100mph limited (?), and a step down from the standard of service people get on comparable ECML/ ECML services.
Nah, the 90s are of little use to us; I'd rather that they were being used in another country in active service
You're forgetting to account for track access charges in your crystal ball lol. Class 90=40.74ppm, mk2 rake=5.96x9=53.64 so the total is 94.38ppm for a Class 90, 8 mk2s and a DVT. A 350 consists of 2 motor vehicles at 8.26ppm each and two trailer vehicles at 6.56ppm each. So an 8 coach Desiro costs 59.28ppm. For the just over that price you could run the Class 90 with 3 mk2s and a DVT, so it's not as clear cut as you're all making out.
they spend half their time running backwards
and I really can't believe that the pointy end streamlining can offer that much aerodynamic advantage when you take into account the air resistance of the pantograph well and rooftop equipment, buffers, couplings, windscreen wipers, and suchlike.