I've tended to dismiss the potential of reopening Skipton-Colne, lumping it within other "hardy perennial" basket cases like Bradford crossrail, Woodhead, Okehampton-Tavistock and so on.
My skepticism may have been increased by the overblown claims made about the reopening by its proponents - that it would be a major cross-Pennine route, important for freight (what freight?, crossing Leeds western approach?), quicker than than Copy Pit line (I've checked; it wouldn't be). But in responding to these claims there are some aspects that I'm not able to dismiss and dare I say it, I'm beginning to think there may actually be a viable case for reopening.
Some years ago forum member Altnabreac produced the following rules of thumb for a successful rail reopening. Let's take each rules in turn:
We could also consider how this compares to other reopenings. Let's look at Borders rail - much lower population, much longer line (30 miles compared to 11 miles Skipton-Colne). If the Borders railway is considered a success then surely Skipton-Colne would be more so.
This just considers the effect of connecting Pendle District to Leeds and conservatively ignores other possible benefits (many of which I remain skeptical about). East Lancs overall has a population of 500,000 and that merits a considerably higher level of service to West Yorkshire than the current 1 tph.
So what do you think? Please feel free to shoot this down in flames - happy for it to be debunked, but right now I can't think why it can.
My skepticism may have been increased by the overblown claims made about the reopening by its proponents - that it would be a major cross-Pennine route, important for freight (what freight?, crossing Leeds western approach?), quicker than than Copy Pit line (I've checked; it wouldn't be). But in responding to these claims there are some aspects that I'm not able to dismiss and dare I say it, I'm beginning to think there may actually be a viable case for reopening.
Some years ago forum member Altnabreac produced the following rules of thumb for a successful rail reopening. Let's take each rules in turn:
- Population of 10,000+ [Earby/Barnoldswick/Colne/Nelson/Brierfield population is 80,000+]
- 60 minutes (75 at a push) journey time of a major employment centre. [Realistic Leeds-Colne time would be 55-60 minutes, so commutable although possibly into 'at a push' territory]
- Extant or mainly unobstructed trackbed [Yes - no doubt some issues but nothing out of the ordinary for a reopening and no major structures needed e.g. tunnels]
- Ability to extend an existing service so more terminal capacity is not required. [Yes - can extend the Leeds-Skipton trains. BUT would need to either electrify the East Lancs route or run bi-modes]
- Regeneration potential of a deprived area [Definitely yes]
We could also consider how this compares to other reopenings. Let's look at Borders rail - much lower population, much longer line (30 miles compared to 11 miles Skipton-Colne). If the Borders railway is considered a success then surely Skipton-Colne would be more so.
This just considers the effect of connecting Pendle District to Leeds and conservatively ignores other possible benefits (many of which I remain skeptical about). East Lancs overall has a population of 500,000 and that merits a considerably higher level of service to West Yorkshire than the current 1 tph.
So what do you think? Please feel free to shoot this down in flames - happy for it to be debunked, but right now I can't think why it can.