Will any of the pathed infrastructure/ aggregate flows into parkeston yard run in the near future?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

spotter62

Member
Joined
31 May 2025
Messages
8
Location
mistley
Aggregate/infrastructure traffic hasn’t run for over a year so I was just wondering when it would restart , given that new paths such as these have been opened
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,101
Location
North London or Mildmay line

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,804
Location
East Anglia
Sizewell C traffic when it starts will be assembled at Parkeston. Up to 4 trains each night are planned to operate from there to the East Suffolk line.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
743
Location
Doncaster
Will the flows to griffon wharf also be involved with Sizewell construction?

I was delving into this yesterday when Sizewell was mentioned in the other thread about paths from Parkeston to Leicester.

There's a 2021 planning document on Sizewell which gives some idea of the rail traffic likely to be involved. In that document they hadn't yet decided between Ipswich Yard and Parkeston Yard as the rail hub, but presumably decided on Parkeston in the end. The intention was that some materials would be railed from there along the East Suffolk Line to an "Ancillary Construction Area" (perhaps similar to the temporary Quainton Railhead for HS2), and other materials would be railed to Ipswich Griffin Wharf for transhipment to marine vessels (similar to how Avonmouth receives aggregate for onward movement to Hinckley Point).

3.2. Rail (page 42)

Current assumptions are:
Ancillary Construction Area: 2 trains per day, 5 days per week
Green Rail Route (GRR): 4 trains per day, 5 days per week

Concrete Aggregates - Supplied from SW England (see detail in section 4.2 below). Jumbo trains, 40-42 wagons, to Acton then split into 2 smaller trains of 20 wagons (compliant with the above project / local rail infrastructure constraints) and pathed to site for discharge.

Fill Aggregates - Supplied from N Wales / N England (see detail in section 4.2 below), Jumbo trains, 40-42 wagons, to Ipswich Rail Yard then split into 2 smaller trains of 20 wagons and pathed to site for discharge or to Griffin Wharf (West Bank), Ipswich Port for transhipment to marine vessels.

Ipswich is emerging as the preferred local hold point, although Harwich is also being investigated.

Cement - Supplied from Midlands / N England (see detail below in bulk materials) standard trains of 20 wagons and routed to Griffin Wharf, Ipswich Port for discharge into the project’s offsite powder terminal.

Potential use of Parkston Quay, Harwich as an alternative to Ipswich Rail Yard.

Materials supplier (Hanson) and their rail freight supply chain partners (Freightliner for SW England / concrete aggregates and GBRf for N England / powder and fill) are engaged and supportive of the above strategy.

Judging from this snippet from a 2024 visit to the Port of Ipswich, Griffin Wharf (on the west bank of the River Orwell) is still on the cards to be involved with the project:

The Port of Ipswich has identified a 15-acre site on their West bank for storing the bulky building materials needed for the construction of Sizewell C. Sizewell C’s transport strategy is for 60% of material to be delivered via sea and rail in order to take pressure off Suffolk’s road network and reduce freight movements around local towns and villages.
https://www.ipswich-labour.org.uk/news/2024/03/25/beyond-the-dock-gate/

Edit: The planning document refers to a "Green Rail Route" (GRR) without clearly explaining what it is, but according to Network Rail it involves building a short connection (off the Sizewell branch) to a "Temporary Construction Area" (TCA), not to be confused with the Ancillary Construction Area (ACA) which will probably be next to the existing line.

https://www.networkrail.co.uk/runni...he-railway-in-anglia/sizewell-rail-programme/

Construction of a temporary ‘Green Rail route’ that connects the branch line to a ‘temporary construction area’ or TCA where materials will be offloaded for use on site
 
Last edited:

Class15

Established Member
Joined
30 Dec 2021
Messages
4,101
Location
North London or Mildmay line
I was delving into this yesterday when Sizewell was mentioned in the other thread about paths from Parkeston to Leicester.

There's a 2021 planning document on Sizewell which gives some idea of the rail traffic likely to be involved. In that document they hadn't yet decided between Ipswich Yard and Parkeston Yard as the rail hub, but presumably decided on Parkeston in the end. The intention was that some materials would be railed from there along the East Suffolk Line to an "Ancillary Construction Area" (perhaps similar to the temporary Quainton Railhead for HS2), and other materials would be railed to Ipswich Griffin Wharf for transhipment to marine vessels (similar to how Avonmouth receives aggregate for onward movement to Hinckley Point).



Judging from this snippet from a 2024 visit to the Port of Ipswich, Griffin Wharf (on the west bank of the River Orwell) is still on the cards to be involved with the project:
Forgive me if I’m misremembering something but isn’t the plan to build a temporary freight line near Leiston branching of the existing one, running close to the abbey, and heading towards Sizewell C?
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,804
Location
East Anglia
Forgive me if I’m misremembering something but isn’t the plan to build a temporary freight line near Leiston branching of the existing one, running close to the abbey, and heading towards Sizewell C?
Yes an extension and sidings that must all be removed in around 12 years time and returned to nature.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Yes an extension and sidings that must all be removed in around 12 years time and returned to nature.
Assuming the construction is on time, which if its anything like Hinckley Point I would not hold your breath.
 

66701GBRF

Member
Joined
3 Jun 2017
Messages
913
It surprises me Ipswich was considered as the front runner. Ipswich yard is too busy with Intermodal and Griffin Wharf is One Train Only operated.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Griffin Wharf may be used as a Port of Entry for the materials before being tripped to Harwich Parkeston Sidings then reverse and remarshalled before being sent on its way to Sizewell C Construction Sidings
 

JKF

Established Member
Joined
29 May 2019
Messages
1,285
Is there a new branch as part of the permanent construction, separate from that for delivery of material? I recall seeing some proposed plans at my last employer about ten years ago and a new rail link was shown (to the north of the current site?). Obviously this could have changed!
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,101
Location
North London or Mildmay line
Is there a new branch as part of the permanent construction, separate from that for delivery of material? I recall seeing some proposed plans at my last employer about ten years ago and a new rail link was shown (to the north of the current site?). Obviously this could have changed!
This is still planned, see posts 12 and 13.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
743
Location
Doncaster
Griffin Wharf may be used as a Port of Entry for the materials before being tripped to Harwich Parkeston Sidings then reverse and remarshalled before being sent on its way to Sizewell C Construction Sidings

Good point. In post #11 I was thinking that Ipswich Griffin Wharf might function in a similar way that Avonmouth does for Hinkley Point, where aggregate or cement arrive by rail for transhipment to vessels. The difference is that Hinkley Point has a jetty in the Bristol Channel for receiving materials, but no local rail access. The coast around Sizewell C looks more like a shallow, sandy beach. The 2021 planning document I linked in my previous post mentions a proposed Marine Bulk Import Facility (MBIF) at Sizewell, but it would only be able to receive shallower coastal vessels, and would be closed over the winter months (almost half the year in fact) due to the weather. I'm not sure if this MBIF is still going ahead or when it would be built:

Temporary Marine Bulk Import Facility (MBIF) – this facility will be constructed and is scheduled to be available from Q2 2025. It has been designed to be used solely for imported fill aggregates. Due to the marine environment and ecological constraint the design of the MBIF has been limited to minimise the extent of marine piling required and this resulted in the MBIF projection into deep water being limited and therefore only suitable for shallower draft ‘coaster’ vessels. This makes the MBIF more susceptible to unsuitable weather, both wind, wave and swell, resulting in vessels not being able to berth. To this extent the off season (November to March) is not planned or assumed for receiving bulk materials by sea.

So receiving materials by ship is less practical at Sizewell than at Hinkley point. But unlike Hinkley, rail access is feasible at Sizewell, so as per your post, the intention is that some materials would arrive by ship at Ipswich Griffin Wharf for transfer to rail. There are some regular WTT schedules now in place for these movements. The timing loads are 715 tons into Griffin Wharf (empty), and 1760 from Griffin Wharf (loaded).

Trains at IPS GRFNW
Selected trains from 00:01 to 24:00 on 01/07/25
Lc Arr Dep Wttid Origin Destination Typ Days From To TC
05:54 ***** 6Y00 PRKSTSSGB 05:12 IPS GRFNW 05:54 WTT EWD 190525 131225 B4
***** 10:05 6A01 IPS GRFNW 10:05 PRKSTSSGB 10:54 WTT SX 190525 121225 B4
11:06 ***** 6Y01 PRKSTSSGB 10:15 IPS GRFNW 11:06 WTT SX 020625 121225 B6
***** 14:10 6A02 IPS GRFNW 14:10 PRKSTSSGB 15:00 WTT SX 190525 121225 B4
15:05 ***** 6Y02 PRKSTSSGB 14:17 IPS GRFNW 15:05 WTT SX 190525 121225 B4
***** 17:43 6A03 IPS GRFNW 17:43 PRKSTSSGB 18:32 WTT SX 190525 121225 B4
18:42 ***** 6Y03 PRKSTSSGB 17:56 IPS GRFNW 18:42 WTT SX 190525 121225 B4
***** 22:35 6A04 IPS GRFNW 22:35 PRKSTSSGB 23:25 WTT SX 190525 121225 B4

isn’t the plan to build a temporary freight line near Leiston branching of the existing one, running close to the abbey, and heading towards Sizewell C?

It seems surprisingly difficult to find a decent map of this...

This "transport strategy" document for the Sizewell project (58 page PDF) is quite old (2012), but has a couple of good maps which help me to visualise what they are doing:
https://www.sizewellc.com/wp-conten...e1_transport_strategy_supporting_document.pdf

Page 37 has two maps. The first shows the red outline of the current terminal used for flask trains. The second map shows a couple of sidings superimposed in blue, which must be the proposed Ancillary Construction Area (ACA). This would be the initial railhead for materials, before the additional "green rail route" is built to the "Temporary Construction Area" (TCA).

The map on page 39 shows three potential routes they were considering for the new line, shown in blue, red, and green. It looks like they chose the green option which is probably how it acquired the name of the "green rail route" (which also has the benefit of sounding environmentally friendly).

This short planning document is more recent (from 2020) and shows the detail of the green rail route, with detailed drawings of site boundaries e.t.c

I saw this video from the Sizewell C Project recently. It's mostly corporate fluff, but from 0:50 it shows the kind of earthworks taking place at the site, and gives a general idea of how things are progressing.
At 0:53 a map comes up on screen showing the three main sites - the power station site itself, the Temporary Construction Area (which will eventually be served by the new line), and the smaller Ancillary Construction Area (next to the existing line, which will come into operation before the TCA and probably be used to receive materials for the construction of the TCA itself and the "green rail route").

Powering Britain’s Future | A Tour of Sizewell C
 

Trailer1

New Member
Joined
20 Sep 2025
Messages
1
Location
Harwich
I noticed the other day a couple of class 20s rounding up the last of the wagons in Parkeston yard, went to work the following day to find the yard completely empty! Not seen Parkeston empty like this before! Would anyone know if they are clearing it to make room for the Sizewell traffic?
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,897
Location
Cambridge, UK
Yep. Here are some examples for ‘Leiston West Junction’ (can anyone confirm exactly where this is please?):

The map below is from page 4 of this presentation - the dashed green line is the 'green rail route' into the SZC (Sizewell C) construction site, which splits off from the existing (dashed black) line from Saxmundham just west of Leiston. I'm guessing that's at ‘Leiston West Junction’, probably in roughly this location

1761943633893.png
 
Last edited:

geordieblue

Member
Joined
11 Jan 2020
Messages
786
Location
Leeds
There was an aggregate train to Great Yarmouth earlier this week - as I understand it the first train for Sizewell C.
 

Obar123

Member
Joined
16 Aug 2024
Messages
115
Location
Cambridgeshire
There was an aggregate train to Great Yarmouth earlier this week - as I understand it the first train for Sizewell C.
Not the first train for Sizewell, they were sending two trains a day into Barham every day for a good 6 months. Then 40 lorry loads a day from there to Sizewell.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,804
Location
East Anglia
Oh I’ve just seen it was actually a loaded aggregate service to Great Yarmouth :o That’s got to be the first freight handled here since the short lived Bunn’s fertiliser traffic in 1999. Another working booked for next Tuesday.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
743
Location
Doncaster
There was an aggregate train to Great Yarmouth earlier this week - as I understand it the first train for Sizewell C.

That’s got to be the first freight handled here since the short lived Bunn’s fertiliser traffic in 1999. Another working booked for next Tuesday.

Interesting... this drone shot shows it being unloaded within the Eastern Rail Services site at the carriage sidings on October 29th:
https://www.flickr.com/photos/68729621@N03/54888309695/ (Photo: Ian Sharman)

The stone originated from Mountsorrel, running as 6F77 12:27 Mountsorrel - Wellingborough on 28th October before continuing that evening as 6L78 23:09 Wellingborough to Great Yarmouth CS.
Return working was 6L79 16:10 to Wellingborough

As predicted in the previous post, 6L78 ran again today (Tuesday 4th Nov) as 02:41 from Wellingborough to Yarmouth, with 66716 and 22 box wagons, returning as 6L79 16:09 to Wellingborough.
The stone was from Mountsorrel again, with the loaded wagons arriving at Wellingborough the previous day as 6F77 12:27 Mountsorrel - Wellingborough.

Today's 6L78 arriving into Yarmouth station: https://www.flickr.com/photos/tibshelf/54901925718/ (Photo: Keith Partlow)
And propelling into the carriaige sidings: https://www.flickr.com/photos/kl47576/54901960003/ (Photo: kingslynn47576)

---------

Railfreight.com reported the first train delivering materials directly onto the Sizewell branch during April:
https://www.railfreight.com/technology/2025/04/23/first-freight-train-to-sizewell-c-reactor/

Can't read much (paywalled) but the photo shows an excavator unloading a "Hawk" JNA wagon, indicating it was a possession train of some sort. Possibly this was ballast for tracklaying at the temporary construction area? I'm not sure what the latest progress is on the branch.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
743
Location
Doncaster
The February newsletter of the Rail Freight Group reports the first delivery of aggregate to the "Ancillary Construction Area (ACA)" near Sizewell. Looking at the map in post #24, the ACA is the red hatched area where the line curves near the yellow caravan symbol. On google maps imagery, earthworks for the ACA are visible and the adjacent car park has the address "ACA site SZC, Eastlands Industrial Estate, King George's Ave, Leiston."

The accompanying picture shows 66795 and a "Hawk" JNA wagon conveying aggregate or ballast, and it looks like at least a couple of sidings have been laid next to the branch.

Some relevant snippets:

The first delivery of aggregate has now arrived at the Sizewell C development... the train reached the project’s Ancillary Construction Area (ACA) via the Sizewell branch line, which has recently undergone significant upgrades delivered by Balfour Beatty Rail on behalf of Sizewell C. The train delivered aggregate to support the ongoing development of on-site rail infrastructure, paving the way for further freight flows as construction progresses. Rail movements are expected to increase in phases, with up to four freight trains per day at peak. The project’s planned Green Rail Route will provide a direct link from the existing branch line to the Temporary Construction Area, bypassing Leiston. https://rfg.org.uk/rfg-news-february-2026-issue-176/

As I understand it, previous workings such as the Yarmouth service discussed upthread have delivered aggregate for the construction of the ACA (and possibly for other works around the Sizewell site), while the ACA will then be used to deliver materials for construction of the green rail route and TCA, which will then be the main railhead for the Sizewell project...
 