What happens if a train wants to follow a previous service through a token section?
Once the train which is in posession of a token leaves the block and the token is inserted into the machine, then it becomes possible for a token to be taken from the machine at either end of the block, the machines being coupled electrically. The direction of travel is not relevant, the important objective is to ensure that only one token may be held at any one time (which represents only one train being in the block at any one time).

There will be a significant number of tokens loaded into each machine, to permit different number of trains to pass in each direction.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

brillopad

Member
Joined
5 Feb 2011
Messages
115
St. Erth - St. Ives. Quite nice when you're on the first train of the day (which sets out from Penzance) and you see the driver take the token from the signalman, a scene that has probably barely changed since the days of steam!

It's a Staff and it looks like it was the one in use when the steam train used to regularly set fire to the grass on Lelant incline.
 

ATW Alex 101

Established Member
Joined
28 Dec 2010
Messages
2,087
Location
Ellesmere port
I was actually in the process of making a new thread about this but seeing this thread, I thought it would deem appropriate to place my question here.

How does this token system work? I really want to know how it works but know nothing on how signalling works in any shape or form, but I am really intrigued to know how this token signalling works. All I know is that the train stops at every signal to pick up a metal key but I don't know what they do with it or anything. Thanks
 

Westboy

Member
Joined
20 Oct 2008
Messages
35
Once the train which is in posession of a token leaves the block and the token is inserted into the machine, then it becomes possible for a token to be taken from the machine at either end of the block, the machines being coupled electrically. The direction of travel is not relevant, the important objective is to ensure that only one token may be held at any one time (which represents only one train being in the block at any one time).

There will be a significant number of tokens loaded into each machine, to permit different number of trains to pass in each direction.

The RAIB gave a good explanation of how it works in their report into the incident at Aylesbury in 2007 here Here

A slightly more complicated practical application, but the pricnciple of interlocking is the same (and not infallible in that instance).
 

robvulpes

Member
Joined
11 Jan 2007
Messages
172
Tokens are in use between Sellafield and St Bees. I'm not sure about he section between St Bees and Whitehaven (Bransty). The single line section from Parton to Harrington has no physical token.

No physical token any more (not for several years, but not sure exactly how many) between St Bees and Whitehaven.

Robert
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
How does this token system work? I really want to know how it works but know nothing on how signalling works in any shape or form, but I am really intrigued to know how this token signalling works. All I know is that the train stops at every signal to pick up a metal key but I don't know what they do with it or anything. Thanks
The purpose of the system is to ensure that only one train can be in the single line section at any one time.

At its most simple, this is achieved by the use of a single staff (often no more than an appropriately marked block of wood!) which must be carried by every* train entering the single line section. The obvious problem with this system is that, once a train has passed through the single line in one direction, it's then not possible for another to follow until the staff has been returned to the start of the section, so its use is restricted to dead-end branch lines with no facility to shut inside at the terminus (like Rufford - Ormskirk, mentioned above). The One Train Working regulations apply in these cases nowadays.

Staff and ticket working, where the Driver of each train was shown the staff before entering the section (thus proving that nothing was coming from the other end) but not necessarily carrying it with him (being given a ticket if not), was an improvement, as it meant that more than one train could pass through the section in one direction without the need to transfer the staff back after each. It wasn't the most flexible though - if the staff somehow ended up at the wrong end of the section (perhaps because the train which was to carry it through was cancelled), you were stuck! I don't know if this is still in use anywhere on Network Rail (I have a feeling it was used somewhere on the Blyth & Tyne until recently?), but the NYMR uses it (or did, at least) south of Goathland.

Electric token block, where a number of tokens were available for each section, shared between (and electrically locked inside) the token instruments in the signal boxes at either end of the section, provided the flexibility that was lacking under staff and ticket. The very clever (and quite simple, at least according to the S&T) interlinking between the two instruments ensured that only one token could ever be removed at any one time, requiring the co-operation of both Signalmen - until that token is restored (at either end of the section), it's impossible to withdraw a second token. The Electric Token Block regulations apply here (worth a read), but the system has been developed further in some places to allow token instruments to be operated by Drivers under the supervision of a single Signalman (e.g. Nunthorpe - Whitby).

* - with a few exceptions, like going into an occupied section to assist a failure etc., or when Working by Pilotman is in operation.
 

SussexMan

Member
Joined
23 Oct 2010
Messages
553
Electric token block, where a number of tokens were available for each section, shared between (and electrically locked inside) the token instruments in the signal boxes at either end of the section, provided the flexibility that was lacking under staff and ticket. The very clever (and quite simple, at least according to the S&T) interlinking between the two instruments ensured that only one token could ever be removed at any one time, requiring the co-operation of both Signalmen - until that token is restored (at either end of the section), it's impossible to withdraw a second token.

That relies on the same number of trains going each way over a period of time otherwise there will come a point when all the tokens are at one end! Hence there was an option to equalise out the tokens.

An imbalance in train workings through a single line section can result in tokens accumulating in one instrument. The instruments may occasionally have to be balanced by maintenance staff who will remove excess tokens from the instrument at one end of the section and transfer them to the one at the opposite end. A magazine balancer, which can hold a number of tokens, may be provided to enable this procedure to be carried out in a secure manner. Tokens can be freely passed through an opening in the side of the instrument when the balancer is properly engaged. A token that is held in a balancer is not valid as authority for a train to occupy the single line section.
Electric Token Block
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
That relies on the same number of trains going each way over a period of time otherwise there will come a point when all the tokens are at one end! Hence there was an option to equalise out the tokens.

Electric Token Block
Indeed, it's not unusual for the S&T to have to balance the tokens by transferring some from one end to the other. I think one of the places where this happens most frequently is, unexpectedly, the Central Wales line, where the presence of a token hut on both platforms (to save time for the Driver) means that they regularly have to be transferred from one instrument to the other at the same location.
 

D6975

Established Member
Joined
26 Nov 2009
Messages
3,050
Location
Bristol
At Maiden Newton, the imbalance is cross-platform too, there being seperate machines on each platform. Every once in a while someone has to remove all the tokens from the Southbound side and put them in the Northbound side.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,202
Many years ago I was on a Blaenau - Llandudno train. We got to Llanrwst and discovered that the token machine had failed - the token could not be returned to the machine (at the Junction).

The errant token was put into safe keeping and a member of staff 'became' the token, with - if I recall correctly - an appropriate piece of cloth tied round his arm! He turned up by car, joined the train, his armband was checked and off we went!
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Many years ago I was on a Blaenau - Llandudno train. We got to Llanrwst and discovered that the token machine had failed - the token could not be returned to the machine (at the Junction).

The errant token was put into safe keeping and a member of staff 'became' the token, with - if I recall correctly - an appropriate piece of cloth tied round his arm! He turned up by car, joined the train, his armband was checked and off we went!
An entirely legitimate practice, just in case anyone's wondering! Working a single line by Pilotman, where the Pilotman should be identified by a red armband worn on his left arm (although, until fairly recently, a red flag or similar was acceptable in the absence of a properly lettered armband), allows trains to continue running during various failures of the signalling equipment (or on a planned basis, for example working to the point of obstruction) which would otherwise stop the job.
 

83G/84D

Established Member
Joined
28 Oct 2011
Messages
6,151
Location
Cornwall
I can't quite remember the locations of the sections and boxes, but physical tokens are exchanged on the Cumbrian Coast Line, and the Barton on Humber branch too.

The St Ives branch is one train working with train staff,technically it is NOT a token. A token is released from an instrument by a signalman in most cases and then allows a protecting signal to be cleared,provided no other tokens are out from any machines. A train staff such as the one on the St Ives Branch does not have to be released from a machine and is in no way linked to the signal controlling the entrance to the branch.

St Blazey to Goonbarrow Jn is a good example of a single track with TOKEN.
 

ATW Alex 101

Established Member
Joined
28 Dec 2010
Messages
2,087
Location
Ellesmere port
Does the cotswold line have physical tokens? I dont think the blackpool south line has physical tokens as i dont recall the train stopping other than at stations.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
I don't know about the St. Ives branch specifically, but it's not uncommon for the signal leading to an OTW section to be released (once) by withdrawal of the staff from the instrument. You're right to highlight the distinction between staff and token though.
 