Talked about previously I'm sure, but this popped into my mailbox today
http://www.ciht.org.uk/en/media-centre/news.cfm/Railway-Signals-To-Be-Removed-On-UK-Network
http://www.ciht.org.uk/en/media-centre/news.cfm/Railway-Signals-To-Be-Removed-On-UK-Network
Which kinda begs the question - how's this going to happen with numerous old trains also using the line ? Does this mean that 100's of older trains that run on parts of these routes, from pacers to sprinters to voyagers will be equipped with ETCS gear to ensure interoperability with the 800 fleet ?Signals to be removed on East Coast Mainline within six years
Trackside signals are to be phased out on the UKs railways with trains controlled wirelessly from 12 regional control centres, Network Rail revealed last week. The operator has begun trials in Hertfordshire of a European Train Control System which removes the need for traffic light signals and speed signs alongside the track. In future drivers will be informed of the maximum permitted speed and whether they can proceed using information inside their cab.
A pilot study three years ago on the Cambrian line in mid Wales proved that the technology can increase the number of trains that can run along a stretch of track. Signals are set to be removed on the East Coast Mainline between London Kings Cross and Doncaster within six years and on the Great Western Railway from Paddington to Bristol within nine years.
Network Rails head of operating strategy Simon Whitehorn said: Rail travel is more popular than ever and by the end of 2019 there will be 225M more passenger journeys each year. We have to look at new and innovative technology to allow more trains to use the railways....
Last edited by a moderator: