Signalling problems: Dorchester - Moreton 26 Feb

Status
Not open for further replies.

Sealink

Member
Joined
16 Aug 2006
Messages
880
Location
Bridport
A signalling problem between Dorchester South and Moreton is causing major problems this morning, with 7 trains cancelled between 0951 and 1213 (Dorchester South timings); others were cancelled earlier.

The current estimate for resolving the issue is "before the start of service on Friday 27th February."

My friend, an ex-signaller, is incredulous that a better service can't be provided.

I wonder what kind of problem this is?

== Doublepost prevention - post automatically merged: ==

My friend has just added this:

"if points are involved it would require a qualified member of staff to secure them (clip and scotch) and act as hand signalman!"

Journeycheck (source of information)
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Brush 4

Member
Joined
25 Nov 2018
Messages
717
Another example of BR rationalisation causing problems years later. Used to be double track there. Sal - Exeter is of course the best/worst case.
 

vikingdriver

Member
Joined
11 Mar 2010
Messages
338
So pilot working needed - but presumably could use modified working of single lines for a specified period or number of trains.
It's not listed in the sectional appendix as having modified working available to be introduced. Not to say you 100% can't though, the page on the Network Rail website is from December 2009.
 

Midland Man

Member
Joined
10 Jun 2017
Messages
45
It's not listed in the sectional appendix as having modified working available to be introduced. Not to say you 100% can't though, the page on the Network Rail website is from December 2009.
Ah getting a Pilot might take time but I agree with the ex signaller's comment as an ex signaller/ inspector myself.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,558
Location
Neilston, East Renfrewshire
My friend, an ex-signaller, is incredulous that a better service can't be provided.

There may be factors we, and your friend, are unaware of, eg staff availability, the effect on the service east of the affected area if trains run through, and whether line blockages are required to find, identify and repair the fault.

It's not listed in the sectional appendix as having modified working available to be introduced.

When I was responsible for introducing Modified Working there was a list of areas where it was authorised - If it was not on the list it did not happen!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,275
It's not listed in the sectional appendix as having modified working available to be introduced. Not to say you 100% can't though, the page on the Network Rail website is from December 2009.
I believe the date at bottom left is the last reprint of the whole document, or section. The latest update to an individual page is in a box at top right and is often much more recent. It’s not a lot newer, but pages either side are much more recently changed, so it is being regularly altered.
 