crazystripe
Member
- Joined
- 1 Jun 2015
- Messages
- 38
Having incurred yet another delay around Welwyn on the northbound ECML this evening (just like most evenings) I was wondering whether additional signal blocks might be a cheap(er) way of increasing capacity without needing to address the obvious "real" issue of the 2-track section over the viaducts and through the tunnels.
Opentraintimes map shows that a train following a delayed service ahead is forced to slow just past Hatfield, for the most part, and doesn't really get moving quickly again till the service in front is well on the way towards getting back onto the 4-track section approaching Knebworth. Why couldn't additional signalling blocks be added between Hatfield and Knebworth to let the following train get closer to the service ahead, rather than today's situation which causes such a "lag" on the following service speeding up again? The problem today is that a delay on one service almost invariably leads to multiple services being delayed as well. Surely this could be avoided with tighter signalling?
Opentraintimes map shows that a train following a delayed service ahead is forced to slow just past Hatfield, for the most part, and doesn't really get moving quickly again till the service in front is well on the way towards getting back onto the 4-track section approaching Knebworth. Why couldn't additional signalling blocks be added between Hatfield and Knebworth to let the following train get closer to the service ahead, rather than today's situation which causes such a "lag" on the following service speeding up again? The problem today is that a delay on one service almost invariably leads to multiple services being delayed as well. Surely this could be avoided with tighter signalling?