A statement "we can't put on replacement buses as we can't get any, but we have arranged taxi services, please be aware there may be a lengthy wait" would be more honest than "it can't be done"
Any more updates on the situation at the moment? Are things getting back to normal?
Im finally nearly at euston after our virgin train from Manchester terminated at watford junction due to a lack of platforms at euston. I fail to understand why this is an issue after the incident happed hours ago, giving time to get rid of this stock since they have a reduced service. Where are all the drivers considering there if a far reduced service and they've had hours to draft in extra drivers if they thought it would be needed.
We slowed down at the flood area, but I couldn't see any water on the line.
Getting a bit better but nowhere near back to normal. LM are completely screwed, most Virgin trains are late or cancelled. Currently on the 30 min delayed 1543 from Euston to Glasgow, hoping to catch the 1742 from Cov to Nuneaton.

Apparently services have now been reinstated to Wolverton and Northampton.
I found this out from the local rag's website; LM it seems cannot yet be bothered to properly update their website.
Hello all
The weather and it's after effects have were pretty poor today around the Crick/Kilsby Area when i passed over the WCML at Kilsby on the A5 this morning around 11.10 looking towards Rugby i could see both tracks were semi and fully covered by water.
And the Roads around there have been a right proper mare aswell- the A5(T) down to Junc 18 was closed as both carriageways were under water, the A5 from Kilsby was closed due to flooding, the A5 north from DIRFT had parts of the road covered in water, and the A361 south from Kilsby had parts of the Road covered too! Also the A45 south of Dunchurch was badly effected along with parts of the M1 aswell, so i could see why it might of been a problem for LM and VT to lay on Buses/Coaches/Taxi's with the severe disruption to the roads that would of lead out,south of Rugby to the A5/A45/M1 corridor(s).
The Fields around that way had hell of a lot of water in them which spilled across the Roads (and railway lines too), it was so bad that myself and another member of the public joined a Network Rail Employee to Rescue an OAP who decided that he could drive his car through a flooded section of country lane between a little Village called Ashby St.ledges that goes upto the A5 (and over the southern end of the Kilsby tunnel) all three of us managed to push this car through a section of 2-3ft of flooded lane!
So if the roads could not cope with the water, the lines that were in cuttings would of been right mares to sort out!
Yes, as I am sure this email is forged that I received at 16:20, as well as the website being updated at that time:
http://londonmidland.mynewsdesk.com...e-northampton-train-services-restored-1338358
[/sarcasm]
Indeed, so what exactly is the TOC commitment to resolve operating issues? T stands for train so why does a TOC need to arrange road transport when the clouds open and routes become under water. Is there anyone who can prevent/mitigate this?
I got the first e-mail but not that one. Furthermore JourneyCheck and the front page, as well as that additional /flooding page, had not been updated as of my posting.
--- old post above --- --- new post below ---
As stated above, there were open roads that would have permitted a Milton Keynes to Wolverton (certainly, very few roads in MK itself were closed) and Milton Keynes to Northampton shuttle. Long Buckby probably indeed wasn't servable, however. And Rugby was being served by VT, so no bus to there necessary.
As has already been asked. Where was this fleet of coaches coming from at such short notice. When we were doing blockades years ago at Stockport and Macclesfield the coaches were coming from far and wide. That was planned. At short notice and with various announcements about road trouble all across England today, where were these coaches coming from? Today was horrific and hopefully not one that I'll see again for a long time.
You're not getting my point. My complaint was not about the non-provision of services if that was because coaches could not be obtained. My complaint was the false statement by LM that due to road conditions no replacement services were operable, when demonstrably a subset of them would have been operable. Only Long Buckby was potentially completely inaccessible, and serving Rugby was unnecessary as VT were serving it. Sufficient roads were open for MKC<->Wolverton and MKC<->Northampton replacement services to operate.
I object to the fobbing-off of passengers with falsehoods. If coaches were unavailable, that should have been stated as the reason for the inability to operate replacement services. But even so perhaps LM could have, for instance, negotiated ticket acceptance with Arriva MK for MKC-Wolverton, or something similarly useful. Or even provided a taxi shuttle; passenger numbers from Wolverton off-peak are not huge, and with disruption elsewhere many wouldn't have bothered.
I get your point perfectly well. We would be likely to run rail replacement coaches if such a critical location (rugby) gets blocked. The fact that we didn't should tell you something. Looking at the state of
things out there yesterday it was near impossible to get coaches.
The m6 and m1 resembled car parks.
Most common way is heading north out of Birmingham when going to Euston, via Soho, Perry Barr and Aston to Stechford though Virgin normally arrange to get the sets turned back the right way as soon as practicable.The 2040 last night was the wrong way round - with standard/A nearest London.
How do wcml trains get accidentally turned around?