Could anyone explain what the descriptions in platforms 1 & 3 at Orpington this evening mean? (*CUT & TIII)

Thanks in advance!

1656531833836.png
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Javelin_55

Member
Joined
9 Apr 2020
Messages
156
Location
South East
"TIII" I'm reasonably sure is referring to a T3 engineering possession. Network Rail have control over a defined section of track and no services can enter that section without authority. This is normally for maintenance or part of an ongoing incident.

"*CUT" I'm less sure about but could be referring to a unit that's been berthed in that platform and "cut out"?
 

E27007

Member
Joined
25 May 2018
Messages
1,032
Platform 3, T111, must be a T3 line block, that track section is under possession.
The *CUT is a puzzle, could it be "Currently Under Test" for example the S&T are testing the track, using a Dropshunt box, in such case the Signaller wouldse see his track circuit indicator for platform 1 ( incidentally a Bay platform line ) going from occupied to clear as the s&T test proceeds
 