• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Signal Box Simulation - Testing

Status
Not open for further replies.

JTAirbus

New Member
Joined
20 May 2021
Messages
4
Location
Derbyshire
Hi Everyone,

Not sure this is the correct place to put it but here we go. I have been building a simulation of Grindleford Signal Box in the Peak district and I was looking for some Alpha testers/advice/opinions. It is still in a basic state but I believe is fairly functional and comes with a timetable spanning 0600 - 1000 on a weekday morning (More coming soon!). It is important to note that this comes with no tutorials etc. (Hopefully also coming soon!) so a fair knowledge of how signalboxes work would be best to avoid confusion. The simulation includes:

- A Working 25 Lever Frame
- Working Block Instruments
- An Illuminated Diagram (See Picture Below!)
- Absolute Block in both directions (To Earles Sidings S.B. and Totley Tunnel East S.B.)
- Basic Interlocking

If anyone has any interest please reply to this thread and I will get the relevant files over to you. Please note that due to a current limitation there may be a requirement to place the file in a fairly specific location.

Regards
James

(Please note that this is a non commercial venture and this post has been authorised by the forum moderation team)
 

Attachments

  • Grindleford_Diagram.png
    Grindleford_Diagram.png
    29.9 KB · Views: 81
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Status
Not open for further replies.

Top