Between Newton Abbott and Plymouth the signalling "Blocks" are very long, frequently causing delays as a few late running trains quickly eat up track capacity.Are there any definate plans to shorten these signalling blocks.Many times(Yesterday for instance) I have been on trains that have had to crawl from Newton Abbot to Totnes and beyond as a result of this problem so delaying late trains even more.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
GWML capacity is at 70 - 90% on this section, and there are no plans to make any improvements or changes
However, much of the signalling is nearing the end of its life and Network Rail will be replacing much of it between 2007 and 2015
Looks like you will need to wait until 2013

2007
Port Talbot (east)
2008
Newport (station and west)
2009
Cardiff
2011
Newport (east)
Reading (Main Line)
Port Talbot (west)
2012
Slough
Goucester
Bristol
Swindon
Worcester
2013
Plymouth
2014
Oxford
2015
Reading (Berks and Hants)
Exeter

Source :
http://www.dft.gov.uk/pgr/rail/strategyfinance/strategy/greatwesternmainlinerouteuti3510
 

devon_metro

Established Member
Joined
11 Oct 2005
Messages
7,714
Location
London
It does need upgrading really although some trains can't be held on the banks as they will never start again!
 