The line between Wigan and Lostock Junction was initially included in the plans for the electrification between Manchester and Preston via Bolton, but has been either cancelled or put on the backburner. Should this line be ahead of others in the electrification queue, ie. TPE North, GWR remaining bits, MML, Victoria to Stalybridge, Windermere and Crewe to Chester?
It seems a bit like a jigsaw which hasn't been completed by not wiring this and it surely wouldn't be a big job being a short stretch? If this line was wired, it would mean all local services between Manchester-Bolton-Wigan could be worked by 319s and 331s, terminating at Wigan and allowing Southport and Kirkby services to go via Atherton, the quicker route. It would also mean diverted WCML services could run via the quicker Bolton route and still serve Wigan.
It seems a bit like a jigsaw which hasn't been completed by not wiring this and it surely wouldn't be a big job being a short stretch? If this line was wired, it would mean all local services between Manchester-Bolton-Wigan could be worked by 319s and 331s, terminating at Wigan and allowing Southport and Kirkby services to go via Atherton, the quicker route. It would also mean diverted WCML services could run via the quicker Bolton route and still serve Wigan.
Last edited: