Should the third rail ban be lifted?

Class450/4DES

Member
Joined
16 Dec 2021
Messages
223
Location
Hampshire (Sometimes South Yorkshire)
Ive been thinking for a few days, should the third rail ban be lifted? Lines like the West of England Line and the North Downs Line are currently having issues in finding a replacement for the DMUs and the government wants to ban new vehicles with fossil fuels. Third rail is quicker and cheaper to install and SWR could find a better replacement for the Class 158/159 units such as converted 350/2s. What are your opinions and ideas?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,280
What are your opinions and ideas?
Even if 'the ban' was to be lifted, there is a substantial cost to installing electrification on these routes.

Notably, there is a 25kV fleet sitting spare right now and no plan to install overhead electrification to allow it to be used.

In the late 1980s Solent Link, East Grinstead and other electrification projects were all authorised on the basis that no new rolling stock was needed. Even the North West electrification in the last decade was justified on the basis of a spare train fleet being available.

The fact that electrification isn't now being afforded even though stock is available is telling, and doesn't appear to have much to do with new third rail installation being 'banned'. It seems fairly clear that something with batteries will appear at some time in the future.
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
997
I think there is a case for allowing 3rd rail where it extends existing installations. It would certainly make sense to me to do that from Basingstoke to Exeter.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,280
I think there is a case for allowing 3rd rail where it extends existing installations. It would certainly make sense to me to do that from Basingstoke to Exeter.
On that, does anyone have a figure for the capital cost of 121 miles of electrification using third rail between Worting Junction and Exeter St Davids?
 

CarrotPie

On Moderation
Joined
18 Mar 2021
Messages
1,128
Location
I think there is a case for allowing 3rd rail where it extends existing installations. It would certainly make sense to me to do that from Basingstoke to Exeter.
And the Uckfield branch. And the Marshlink line. And I'm sure someone will have something to say about Wokingham-Redhill.
 
Joined
21 Dec 2016
Messages
115
If it is officially or unofficially a ban, yes either way.

The Marshlink, North Downs, Uckfield and Merseyrail extensions (Ormskirk to Preston, Headbolt Lane to Wigan, Bidston to Wrexham and Hunts Cross to Warrington) should be electrified in combination with the introduction of battery EMUs on these lines so that the whole lines are not required to be electrified and so that any areas at higher risk of trespass also do not need third rails installing.

Would allow improved services, decarbonisation and air quality benefits.

When including 4th rail underground services, I would estimate that over half of the country’s passengers are carried on 3rd and 4th rail electrified services so the existence of this quantum without the world coming to end would suggest that minor increases in the extent of the electrified third rail network would not hugely increase risks.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,666
Ive been thinking for a few days, should the third rail ban be lifted?

There isn’t a ban.

There is a ‘presumption against’, which is different. New third rail is permitted, and indeed has been done in recent years in various places. But you have to demonstrate why it is the best opton compared to alternatives.

Lines like the West of England Line and the North Downs Line are currently having issues in finding a replacement for the DMUs

What issues are these?


and the government wants to ban new vehicles with fossil fuels.

Does it?
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,414
Location
Taunton or Kent
There isn’t a ban.

There is a ‘presumption against’, which is different. New third rail is permitted, and indeed has been done in recent years in various places. But you have to demonstrate why it is the best opton compared to alternatives.
Can you cite examples of this please (I'm not saying you're wrong, I'm genuinely curious)? The latest I know of is the 1994 Redhill-Tonbridge electrification.

If it were possible to electrify some lengthy third rail sections, the Uckfield Line and Marshlink would be my preference, then Southern can send their 171s to bolster other TOCs where DMUs are a premium. Then they could tag onto Southeastern's fleet tender with a follow up to bolster their EMU fleet and be free of diesel.

The North Downs line is almost perfectly setup for BEMUs; third rail at both ends with a decent island in the middle, and GWR are looking at BEMUs, so full electrification here is less worthwhile. WEML is too long and goes far too far away from the rest of the third rail land, combined with a relatively low train frequency.
 
Last edited:

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,280
The latest I know of is the 1994 Redhill-Tonbridge electrification.
East London Line extensions
Nine Elms on the Northern Line

I don't think the debate has really moved on much from this post by 'Bald Rick' in 2024 - https://www.railforums.co.uk/thread...rrs-current-policy.270739/page-3#post-6851141

There seems to be a 'money no object' view to the idea that more electrification will happen imminently when there are evidently lots of challenges about the availability of funding for the railway. The battery units for the current diesel routes will no doubt come in due course, just as we witness the bus industry sending out electric buses onto ever longer route schedules.

While it is apparent that 159s / 165s etc are reaching the age when predecessor fleets have been replaced, they aren't the only units in that position. Even if electrification were approved tomorrow, what is the lead time before it would be ready? The premise of the original post is that there are units shortly available but the capital cost seems a challenge.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,666
Can you cite examples of this please (I'm not saying you're wrong, I'm genuinely curious)? The latest I know of is the 1994 Redhill-Tonbridge electrification.

If it were possible to electrify some lengthy third rail sections, the Uckfield Line and Marshlink would be my preference, then Southern can send their 171s to bolster other TOCs where DMUs are a premium. Then they could tag onto Southeastern's fleet tender with a follow up to bolster their EMU fleet and be free of diesel.

The North Downs line is almost perfectly setup for BEMUs; third rail at both ends with a decent island in the middle, and GWR are looking at BEMUs, so full electrification here is less worthwhile. WEML is too long and goes far too far away from the rest of the third rail land, combined with a relatively low train frequency.

On the national Network in seperate projects with seperate justifications (AIUI), there are at least the following:

East London Line from Shoreditch to Dalston Junction and New Cross Gate flyover
East London Line from Dalston Junction to Highbury & Islington
East London Line from Silwood Jn to Old Kent Road Jn
Three Bridges Depot - access lines and sidings

Examples on the underground too - Northern extension, Jubilee extension, T5 extension etc.


Uckfield and Ashford - Ore are ideal for batteries too.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,301
Location
Yorks
There isn’t a ban.

There is a ‘presumption against’, which is different. New third rail is permitted, and indeed has been done in recent years in various places. But you have to demonstrate why it is the best opton compared to alternatives.

Which is a de facto a ban.

And it should be lifted for infill schemes, which was the sensible compromise for many years.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,058
Location
West Wiltshire
There is a strong case for the few miles of 'infills'
Uckfield line
Reigate - Shalford (Guildford)
Wokingham - Ash
Ashford - Ore

A sensible case for
Basingstoke (Worting) - Andover - Salisbury
Redbridge -Salisbury (and maybe Romsey - Eastleigh)
Dorchester Junction - Dorchester West
If a dual voltage BEMU fleet was introduced could easily shorten third rail extension to just Andover and Romsey, and run on batteries to/from Salisbury.

Realistically for GWR services to operate with dual voltage BEMUs going to have to add few miles of overhead in Westbury - Warminster / Bruton area (and use the extra section at Dorchester to recharge too).

SWR services would need to have a few sections of overhead too, not sure of charge rates of any new BEMUs, but at a guess some 5 mile sections near Gillingham, Crewekerne and Pinhoe

For clarity I would suggest Waterloo - Salisbury - Exeter, and Cardiff - Portsmouth and Gloucester - Weymouth dual voltage BEMUs should be one common design, comfortable enough for 3+ hour journeys, and able to cope with certain amount of churn, with sufficient luggage space for those from SW and Wales going to/from cruise ships.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,778
Location
Newport
Which is a de facto a ban.
It’s the application of the Electricity At Work Regulations 1989. Either a change is needed to the regulations or a challenge to ORR’s interpretation of ALARP on a 3rd rail electrified railway.

Sounds like a job for RSSB and NR but neither appears to have a head over the parapet on this one.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,348
Location
The Fens
There seems to be a 'money no object' view to the idea that more electrification will happen imminently when there are evidently lots of challenges about the availability of funding for the railway.
This is the key point. The 2025 spending review was less than a year ago. Once HS2, Trans Pennine and East West Rail have takes their shares there isn't much left for other schemes. Most of what's left goes on improving commuting into fast growing cities outside London. The next spending review won't be much different, no 3rd rail electrification scheme is going to get anywhere near the top of the priority list.

There is a strong case for the few miles of 'infills'
Uckfield line
Reigate - Shalford (Guildford)
Wokingham - Ash
Ashford - Ore
There is zero case for any of these, whatever the financial circumstances. All of them will be electrified much more cheaply and much more safely with electric/battery bimode trains.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,456
Location
Northampton
There is a strong case for the few miles of 'infills'
Uckfield line
Reigate - Shalford (Guildford)
Wokingham - Ash
Ashford - Ore

A sensible case for
Basingstoke (Worting) - Andover - Salisbury
Redbridge -Salisbury (and maybe Romsey - Eastleigh)
Dorchester Junction - Dorchester West
If a dual voltage BEMU fleet was introduced could easily shorten third rail extension to just Andover and Romsey, and run on batteries to/from Salisbury.
If there was a case for any of these, they would have been done by now.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,456
Location
Northampton
The use of Battery Trains is not electrification. It's a special train that can power itself.
A Battery train is an electric train that carries it's power with it. In electrified areas, it functions as a EMU. It just means you don't need to electrify every last inch of line to run an electric service.

== Doublepost prevention - post automatically merged: ==

Only if there was money available to do it.

There's a case for a lot of things, but if there's no money, it won't be done.
The whole point of there being 'a case' is that it would justify the borrowing to pay for the upgrade.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
A Battery train is an electric train that carries it's power with it. In electrified areas, it functions as a EMU. It just means you don't need to electrify every last inch of line to run an electric service.
So by that logic, a Class 220 is an Electric Train...

== Doublepost prevention - post automatically merged: ==

The whole point of there being 'a case' is that it would justify the borrowing to pay for the upgrade.
The continuing proliferation of DFBO (Design Finance Build Operate) contracts since the 1990s disagrees with this.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,058
Location
West Wiltshire
There is zero case for any of these, whatever the financial circumstances. All of them will be electrified much more cheaply and much more safely with electric/battery bimode trains.
There is a common misconception that BEMUs will always be cheaper than token lengths of electrification. That's true if already have them lying around spare or getting new trains anyway.

But the economics are different when doing the infills mean can diagram an existing fleet more efficiently, rather than buy or lease a non-standard fleet just to cover a few miles of track (and most of those electrostars are likely to be around for another 15-20 years). Inevitably with the non standard fleet need more vehicles (because cannot use the main electric fleet as cover for maintenance and failures). Even a 3car BEMU unit is going to cost a few million pounds, and if need a few units to cover your non electrified gap, then there is a big cost of keeping a supplementary non-electric fleet
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,456
Location
Northampton
So by that logic, a Class 220 is an Electric Train...
No it isn't, because in an electrified area it doesn't pan up.

It would be perfectly possible for a BEMU to have it's battery pack removed or isolated and still function as an EMU. Try taking the fuel tank off a 220 and see how far it gets.

== Doublepost prevention - post automatically merged: ==

There is a common misconception that BEMUs will always be cheaper than token lengths of electrification. That's true if already have them lying around spare or getting new trains anyway.

But the economics are different when doing the infills mean can diagram a fleet more efficiently, rather than buy or lease a non-standard fleet just to cover a few miles of track. Inevitably with the non standard fleet need more vehicles (because cannot use the main electric fleet as cover for maintenance and failures). Even a 3car BEMU unit is going to cost a few million pounds, and if need a few units to cover your non electrified gap, then there is a big cost of keeping a supplementary non-electric fleet
However, the economics change once again if doing a general fleet renewal to an all-BEMU fleet, where the majority are specified for 'limp mode' batteries but a sub-class are specified for full service range.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,778
Location
Newport
A BEMU presumably has a much higher current draw than a conventional EMU of the same size when it’s in an electrified area, as it has to both power itself and charge the batteries. Hopefully, the fringe areas where they will charge can support this?? Will that limit BEMU train length?
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,381
However, the economics change once again if doing a general fleet renewal to an all-BEMU fleet, where the majority are specified for 'limp mode' batteries but a sub-class are specified for full service range.
The economics may change, though I suspect there are a lot of hidden costs to running small restricted use sub-fleets that aren’t well captured. But the principles that supported extensions like Hastings and East Grinstead were based on commonality - something that gets destroyed when you build separate sub-fleets. The infill projects of Romney marsh and Uckfield should be so obvious as to not need discussion.

North Downs is trickier because of the service pattern; I can see a case there for batteries instead of “proper” electrification if it remains with a Reading based fleet.

The other, longer distance, examples are IMHO pie in the sky given the ease of building dual voltage capability into trains - the presumption against 3rd rail is reasonable, even if the detailed application is excessively robust.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,058
Location
West Wiltshire
A BEMU presumably has a much higher current draw than a conventional EMU of the same size when it’s in an electrified area, as it has to both power itself and charge the batteries. Hopefully, the fringe areas where they will charge can support this?? Will that limit BEMU train length?
Peak power draw is only around 20% of the time (varies by route of course), remainder is maintaining speed, coasting, braking, stopped at stations etc).

But you are correct in thinking the electrification limits / ideal changeover points are different for a BEMU and in many cases a few hundred metres of extra electrification will be needed to avoid changeovers when pulling away from a junction signal, or accelerating away from a speed restriction at junction itself. Just operating a BEMU where wire end points were based on pure electric fleet is not ideal operationally because changing system where need highest power.

== Doublepost prevention - post automatically merged: ==

The economics may change, though I suspect there are a lot of hidden costs to running small restricted use sub-fleets that aren’t well captured. But the principles that supported extensions like Hastings and East Grinstead were based on commonality - something that gets destroyed when you build separate sub-fleets. The infill projects of Romney marsh and Uckfield should be so obvious as to not need discussion.
Exactly, pre privatisation BR seemed to understand the costs and economic effects better (have they been forgotten over time?). Not just Hastings and East Grinstead lines, but can add Largs, Braintree, Romford-Barking, Solent lines via Fareham etc. All allowed more efficient diagrams and smaller overall fleet.

There are big costs to keeping tiny non-standard small fleets, and an oversize number of non-electric spare units to cover short non electrified gaps. Especially where it will be years before main fleet is replaced (probably 15-20 years for 375, 377, and nearer 30 years for 387s)
 
Last edited:

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,348
Location
The Fens
There is a strong case for the few miles of 'infills'
Uckfield line
Reigate - Shalford (Guildford)
Wokingham - Ash
Ashford - Ore

There is a common misconception that BEMUs will always be cheaper than token lengths of electrification.
None of these are token lengths.

24 miles Uckfield line
17 miles Reigate - Shalford (Guildford)
13 miles Wokingham - Ash
15 miles Ashford - Ore

The use of Battery Trains is not electrification.
The use of battery trains is electrification. The power comes from the grid, the train doesn't have to generate its own power with an internal combustion engine.

The infill projects of Romney marsh and Uckfield should be so obvious as to not need discussion.
They may have seemed obvious 40 years ago but they are not obvious now. The capability of an electric/battery bimode train was just a dream 40 years ago but it is fast becoming a reality now.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Ive been thinking for a few days, should the third rail ban be lifted? Lines like the West of England Line and the North Downs Line are currently having issues in finding a replacement for the DMUs and the government wants to ban new vehicles with fossil fuels. Third rail is quicker and cheaper to install and SWR could find a better replacement for the Class 158/159 units such as converted 350/2s. What are your opinions and ideas?

It would probably make sense to do some fill-in work like Kirkby to Headbolt and on to Wigan and Ormskirk to Burscough. Yes, there are the battery units, but those could then be used for other longer off-third-rail stuff like Wrexham with new non-battery units procured.

It probably wouldn't make sense to do big stuff like West of England. If that was to be electrified it should be at 25kV with dual voltage units used (which the 450s are capable of being converted to).
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,381
They may have seemed obvious 40 years ago but they are not obvious now. The capability of an electric/battery bimode train was just a dream 40 years ago but it is fast becoming a reality now.
That may be, but the issue is also one of principle - replacing the current DMU fleets with restricted use sub-fleets is a seriously sub-optimal way of resourcing these lines. The objective should be to have a common fleet, and benefit from the economies of scale that supported the NSE & Scotrail 1980s electrifications.

This is not primarily a technological issue but an operational one.
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,381
Would a BEMU obtain sufficient charge between London and Hurst Green to run to Uckfield and back? If not, an extension of sufficient length to recharge would be necessary, in which case an extra length of third rail from Hurst Green would seem to be the logical option.
A few years ago, the suggestion was that there would be enough charge but with very little contingency. There were also questions about the amount of power that would be required to be drawn on the climb from Croydon to Oxted to charge batteries on top of providing traction. There was also a question about the National Grid infrastructure's ability to provide a charge boost at the Uckfield end.
 