The study reported that extending the wires to Bedwyn had a good case (BCR 2.58) due to maintaining through services to Paddington/Reading. However, the option for wires to Westbury had a poor case (BCR 0.31) since through services to Paddington would remain regardless of whether the wires were up. Having shiny new bi-mode IEPs maintaining the through services would probably have made the case even worse.But there has already been talk of extending the wires beyond Newbury because of the Bedwin services, one option even included running to Westbury and then back to Bath to allow for diversion works on the GWML.
As such, you could be looking at running IC125's for about 1/3 of the way from London to Plymouth under the wires. Which could push things quite a long towards IEP's. Espcially if there is a good case to wire up the line between Taunton and Plymouth (another 1/3 of the distance) for XC services.
To cover a third of the distance from PAD to Plymouth you'd need to wire 75miles, getting you almost to Pewsey. Bedwyn would be about 66 miles wired, with another 159 to Plymouth. Halfway to Plymouth would be 112.5 miles, a bit short of Castle Cary.
With another 80miles thence to Penzance, a third of the route becomes arround 102 miles (Paddington to Frome), and half the route 153 miles (Paddington to just past Taunton (via Westbury)).
If Bristol/Taunton - Plymouth and Paddington - Westbury were all wired, that would be a fair proportion under the wires meaning the bi-mode's total fuel consumption is then likely to be less than an IC125 running on diesel all the way. It would also cut the proportion of the journey the engines are running for those who don't like underfloor engines.
I don't think Paddington - Newbury/Bedwyn is enough to make bi-mode a better choice than retaining IC125s, but extend the wires so it's closer to a 50/50 split diesel/electric and bi-mode starts to look better.
And this sounds even better than bi-mode, no need to lumber the majority of the fleet with the maintenance costs of diesel traction. If done in CP6, the IC125s only need to manage until 2025 rather than 2035.Network Rail Electrification RUS said:Berks and Hants Option A12.2c: Overhead AC electrification of Newbury to Cogload Junction, following GWML electrification and cross-country electrification to Plymouth. This permits long distance West of England services from Paddington to convert to electric traction. Beyond Plymouth, the RUS assumes that through services will be maintained by attaching a diesel loco at Plymouth. Paddington to Bedwyn services are also assumed to convert to electric traction.