With the scaled back nature of HS2, there will be less of a need for portion working requiring two 200m units to make the most out of the 400m maximum length, thus more services running as single units, with fixed 400m long trains only likely to be used on services from London Euston to Birmingham Curzon Street and Manchester Piccadilly once HS2 reaches Manchester.
This would most likely leave the vast majority of services being worked with 200m long trains, representing a decrease in capacity from an 11 carriage Pendolino. With this in mind, should some HS2 trains be 250m/10 coaches long to make the most out of platform lengths on the classic routes that HS2 services will use?
I'd suggest that 250m long trains be used on the initial London Euston to Manchester Piccadilly services as part of the Phase 1 and Phase 2A service pattern, being displaced by fixed 400m long units once Phase 2B is complete and moved onto other services not involving portion working that make use of classic infrastructure.
This would most likely leave the vast majority of services being worked with 200m long trains, representing a decrease in capacity from an 11 carriage Pendolino. With this in mind, should some HS2 trains be 250m/10 coaches long to make the most out of platform lengths on the classic routes that HS2 services will use?
I'd suggest that 250m long trains be used on the initial London Euston to Manchester Piccadilly services as part of the Phase 1 and Phase 2A service pattern, being displaced by fixed 400m long units once Phase 2B is complete and moved onto other services not involving portion working that make use of classic infrastructure.