Should more 484 units have been provided for island line services?

Status
Not open for further replies.

Elshad

Member
Joined
23 Oct 2018
Messages
66
Location
London
Anyone else think 5 units is cutting it a bit too thin? A 30-minute service will require 4 units during the peak, leaving just one unit spare (i.e. not even a full 4-car train). I would have thought an extra unit (for a total of 6) would have provided more resilience for when things go wrong.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,313
Anyone else think 5 units is cutting it a bit too thin? A 30-minute service will require 4 units during the peak, leaving just one unit spare (i.e. not even a full 4-car train). I would have thought an extra unit (for a total of 6) would have provided more surplus capacity for when things go wrong.
They don’t intend running them in pairs normally, it will only be 2 from 5 in use.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,049
Location
Up the creek
Even before the losses caused by the changes of the last year or so, they were only going to need four-car sets on a few summer Saturdays and Bank Holidays. It should be possible to arrange maintenance schedules so that a maximum of only one set is out of use on these days.
 

MotCO

Established Member
Joined
25 Aug 2014
Messages
6,142
Even before the losses caused by the changes of the last year or so, they were only going to need four-car sets on a few summer Saturdays and Bank Holidays. It should be possible to arrange maintenance schedules so that a maximum of only one set is out of use on these days.

Doesn't leave much scope for cannibalisation if they are to last as long as the 483s :)
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
Doesn't leave much scope for cannibalisation if they are to last as long as the 483s :)
There's a pile of D stock at Long Marston to rob if needed. It should also be noted that the 484s are much more thoroughly refurbished than the 483s were. They have new AC traction motors (from TSA, I think) and associated control systems, so presumably spares support with be ongoing for some considerable time.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,200
Doesn't leave much scope for cannibalisation if they are to last as long as the 483s :)
The difference being that Vivarail is a going concern and will be able to support the units for a lot longer.
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,518
Doesn't leave much scope for cannibalisation if they are to last as long as the 483s :)
I would imagine that once the D train program wind's down there will still be plenty of spare parts and SWR will buy an appropriate amount of the critical parts before the rest of the trains go for scrap.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,281
The difference being that Vivarail is a going concern and will be able to support the units for a lot longer.
What will happen to Vivarail once they've sold all the D78s they have? Will they still be around in 20 years?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,200
What will happen to Vivarail once they've sold all the D78s they have? Will they still be around in 20 years?
They're moving towards becoming a battery technology specialist. @Woods has kindly quoted a Modern Railways article here.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,281
They're moving towards becoming a battery technology specialist. @Woods has kindly quoted a Modern Railways article here.
Interesting, considering the initial plans seemed mainly about converting D78s into DMUs!
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,335
Location
Reading
Interesting, considering the initial plans seemed mainly about converting D78s into DMUs!
This of course is the big ugly secret of private companies - they have to adapt to the market...

...and as quickly as possible.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,200
Interesting, considering the initial plans seemed mainly about converting D78s into DMUs!
Don't think it took them all that long to realise that diesel conversions would be a dead-end market.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Don't think it took them all that long to realise that diesel conversions would be a dead-end market.

Diesel has proven to be a dead-end market, but so has D-train generally, in the UK - there seems to be little appetite for it any more (probably not helped by observations of Marston Vale, and the host of delays in all fleets entering service), nor any suitable routes not due anything better
 

birchesgreen

Established Member
Joined
18 Aug 2015
Messages
7,691
Location
Solihull
Its the low top speed which keeps it a niche, the vast majority of lines it won't be suitable because of that.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,618
Location
Torbay
Interesting, considering the initial plans seemed mainly about converting D78s into DMUs!