• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Should Bradford Forster Square P3 be extended?

Status
Not open for further replies.

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
With platform zero at Bradford Forster Square almost complete and operational, should P3 be lengthened so that all the platforms are the same length ?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bradford1

Member
Joined
15 Apr 2024
Messages
41
Location
Bradford
I was just wondering what exactly was the reason for building the new platform zero so long. Today is the first day of operation and the LNER trains aren't even using it.

Platform 1 and 2 are already long enough for LNER (whose new services are not even hourly), and I haven't seen any plans for Northern to introduce six-car trains to Bradford.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
With platform zero at Bradford Forster Square almost complete and operational, should P3 be lengthened so that all the platforms are the same length ?
From an operational perspective, yes absolutely. Having all platforms the same length makes managing services so much more flexible for both planners and signallers/controllers.

Is it worth it? Depends on the amount of services that aren't able to use it. From the pictures on the new platform construction thread there appear to be quite a few equipment cabinets and OLE stanchions that would need to be moved to extend the platform. However this wouldn't cost *that* much in the scheme of things, but I also suspect that when assessing the need for platform 0 the option of lengthening P3 would have been looked at and was obviously not chosen.
I was just wondering what exactly was the reason for building the new platform zero so long. Today is the first day of operation and the LNER trains aren't even using it.
Most likely because there wasn't any particular saving from not building it the same length. The tracks would have had to go in the same place anyway, the land was available, and there wasn't (from the photos on the construction thread) any signalling equipment to move, while the OLE stanchions would have needed to be moved for the track anyway.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,301
Location
milton keynes
With platform zero at Bradford Forster Square almost complete and operational, should P3 be lengthened so that all the platforms are the same length ?
All this lengthening seems to be in the wrong direction, heading off to Shipley. Restoring pre-1990s old buffer stops would be just fine for platform length and the right direction. Shame about that big building in the way though, it's gotta go.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,949
Location
Airedale
From previous discussions, P3 ends at a solid-looking retaining wall, so there would have been some considerable earth (or rock?) moving.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,704
Location
Leeds
All this lengthening seems to be in the wrong direction, heading off to Shipley. Restoring pre-1990s old buffer stops would be just fine for platform length and the right direction. Shame about that big building in the way though, it's gotta go.
Why stop at that building? Just keep going, see where you end up ;)

A question though. Is it better to have four long platforms or six shorter platforms? As a passenger, I don't want longer platforms; I want a short walk to/from the gate line. If we're taking out Centenary Court for platform extensions then why not more platforms as well?
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,882
From previous discussions, P3 ends at a solid-looking retaining wall, so there would have been some considerable earth (or rock?) moving.
Yes, you either have to sort out the retaining wall or move the P3 tracks towards P2 (there is space, but obviously would need build out the platform and move equipment between the tracks).
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,283
Location
Oxford
If the longer platforms are mainly to permit LNER trains, then 3 of them is probably sufficient for a 2 hourly service.
 
Status
Not open for further replies.

Top