I couldn't find a thread to ask this in, so I'll ask here. Why haven't the GWML station platforms been extended to fit Class 345s? It seems strange that there so many platforms that cannot accommodate the whole train.

I don't know about the other end of the route, but it seems strange that this work was not done when it has been done on similar metro networks such as SWR. Is it deemed less important because of the walkthrough nature of the trains in use?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,132
Location
Selhurst
Most of them have, it's really only the smaller stations like Langley and Iver where the cost of extending the platforms isn't justified, and yes it's not too important because the trains are walkthrough
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
12,000
Location
here to eternity
Why haven't the GWML station platforms been extended to fit Class 345s?

An assessment would have been done several years ago to find out whether platform extensions were either feasible or had a business case. Selective Door Opening (SDO) can be used where no case for an extension exists.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,004
Location
London
SDO doesn't really make it necessary. In any event its normally just a few doors on the GWML. On the GEML several stations can only take 7-cars but there's plenty of pre-warning on 345s, you can walk through and its in the CIS announcements.

If the 345s ever get extended to 11-cars, it will be more of an issue.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,677
Location
Nottingham
At least the 345s are equipped with information systems and indicators by each door that show when it won't be opening at the next station.
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
526
Location
Ilford
Not just the GWR section. In the east, Maryland, Forest Gate, Manor Park can only accommodate 7 cars.
 

FGW_Lad

Member
Joined
19 Mar 2011
Messages
150
Location
Berkshire
Most of them have, it's really only the smaller stations like Langley and Iver where the cost of extending the platforms isn't justified, and yes it's not too important because the trains are walkthrough
I’m not sure about Iver but I don’t think Langley can be extended southbound due to railway equipment. Northbound definitely not as the road bridge is in the way. As others have said SDO doesn’t really make it a problem.
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,281
I believe for at least one western station local planners objected to lengthening, possibly because of tree removal or similar?
 

Highview

Member
Joined
22 Aug 2023
Messages
75
Location
London
What is annoying, at least on the Western side - is the generic automated announcement saying there is a short platform and to move forward to the front part of the train without any indication of how far you need to walk forward - I noticed last week that the specific door indicators go red but not everybody realised this.
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
526
Location
Ilford
What is annoying, at least on the Western side - is the generic automated announcement saying there is a short platform and to move forward to the front part of the train without any indication of how far you need to walk forward - I noticed last week that the specific door indicators go red but not everybody realised this.
Same on the eastern side!
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,296
the cost of extending the platforms isn't justified, and yes it's not too important because the trains are walkthrough
The DLR trains are walkthrough as well. If you have seen as many (mainly visitors) as I have overcarried at short-platform Greenwich Cutty Sark, one of the key tourist points on the system, then there might be a different opinion.
 
Last edited:

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,575
Location
Brighton
I’m not sure about Iver but I don’t think Langley can be extended southbound due to railway equipment. Northbound definitely not as the road bridge is in the way. As others have said SDO doesn’t really make it a problem.
Langley doesn't look that difficult. Whether it's cost effective is another matter, but the railway equipment can be moved back out of the way, and extending the other platforms out over the road bridge is easy enough, but I don't understand why you don't think they could be extended back the other way? Looks plenty clear enough on Google maps?
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,004
Location
London
Langley doesn't look that difficult. Whether it's cost effective is another matter, but the railway equipment can be moved back out of the way, and extending the other platforms out over the road bridge is easy enough, but I don't understand why you don't think they could be extended back the other way? Looks plenty clear enough on Google maps?

Maybe it was just not deemed cost effective to do so. It's one of the stations with the lowest footfall.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
Hanwell is partially because of its listed status , Wharncliffe viaduct to the west and some points to the east
 

Purple Train

Established Member
Joined
16 Jul 2022
Messages
2,465
Location
Despond
Taplow and Iver I suspect are uneconomic, especially given the sums on new station architecture for them. Twyford seems to have been done in the down direction, but the up platform definitely can't be extended without cutting off the Henley branch (the platform curves to follow the point). Burnham is an island platform, which makes width issues trickier - it can't be extended in the London direction because of the road bridge, but in the Reading direction I'm not so sure, especially given it's only an extra carriage. I'm not sure whether Hayes & Harlington can physically fit the entire train - station literature suggests that the very rearmost door doesn't open, but I'm sure I've seen all doors open before.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
Taplow and Iver I suspect are uneconomic, especially given the sums on new station architecture for them. Twyford seems to have been done in the down direction, but the up platform definitely can't be extended without cutting off the Henley branch (the platform curves to follow the point). Burnham is an island platform, which makes width issues trickier - it can't be extended in the London direction because of the road bridge, but in the Reading direction I'm not so sure, especially given it's only an extra carriage. I'm not sure whether Hayes & Harlington can physically fit the entire train - station literature suggests that the very rearmost door doesn't open, but I'm sure I've seen all doors open before.
Hayes is only platform 5 .but I believe the train software cannot tell what platform it is in so it cuts out the rear door on all of them
 