• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Shipley Depot Progress

MichaelTrains

Member
Joined
9 Jun 2022
Messages
356
Location
Bradford
The new depot, which was officially announced on Thursday 14 March 2024 by Rail Minister Huw Merriman MP during a visit to Shipley Station, forms part of the Government’s latest £3.9billion investment into what is one of Britain’s largest rail projects.

Initially, the rail depot will be used to house and maintain Northern’s fleet of electric trains on the Airedale and Wharfedale Lines while access in and out of their Neville Hill depot in Leeds is restricted during a future phase of TRU.
I've just been to see the latest developments of the new Shipley depot for Northern.

Do we know how many trains will be stored here in an evening?
 

Attachments

  • IMG_0254.jpeg
    IMG_0254.jpeg
    4.4 MB · Views: 264
  • IMG_0253.jpeg
    IMG_0253.jpeg
    5.1 MB · Views: 264
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,856
I've just been to see the latest developments of the new Shipley depot for Northern.

Do we know how many trains will be stored here in an evening?
The wikipedia page for the depot claims it has capacity for 40 trains (https://en.wikipedia.org/wiki/Shipley_TCC) but this surely means carriages.

The planning application (https://planning.bradford.gov.uk/on...s.do?activeTab=documents&keyVal=SDKJTPDH0IL00) has lots of information about the depot.

From the look of the plans you have the following:

- maintenance building which has 4 'roads', each 4 carriages long.
- under-frame cleaning building - 1 train, again 4 carriages long.
- service sidings - 4 roads, each look to be up to 6 carriages long.

So it can take up to 9 4-car trains, or up to 13 3-car trains.

Add that to the sidings at Skipton and you've got depot and storage capacity for the entire Airedale and Wharfedale lines service. This is a very good thing, as getting trains out of Neville Hill and through Leeds is difficult given how busy the network is and it often leads to cancellations.
 

MichaelTrains

Member
Joined
9 Jun 2022
Messages
356
Location
Bradford
Yeah, I can’t see how they can get 40 trains in such a small space.

I think you're right and they mean carriages which will be 10-14 trains.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
592
Location
Hull
NR issued press release from yesterday;

"The site has now been completely cleared and flattened, with all contaminated soil from its former use as a scrapyard moved away. A large retaining wall has also now been installed along the western edge of the site which will enable the safe construction and operation of the main facility."
 
Last edited by a moderator:

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,625
Location
Rochdale
When can we expect to see the lines going in?

Foundations, under track pits and the actual buildings themselves you'd expect at least 9 months to a year. It's unlikely any rails (visible from outside) would go down before that.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,939
Location
Airedale
Latest activity at the scrapyard (aka traincare depot). The retaining wall is impressive.
There is a 2-day engineering block this weekend, which may be about installing pointwork.
 

Attachments

  • IMG_20260421_123247994.jpg
    IMG_20260421_123247994.jpg
    4.8 MB · Views: 165
  • IMG_20260421_123013026.jpg
    IMG_20260421_123013026.jpg
    3.9 MB · Views: 165

TransportHub

Member
Joined
20 May 2015
Messages
176
Location
London
Also worth noting Northern have started advertising jobs for the depot in the last few days.
Interesting there are new jobs, unless there's a big service uplift planned, I would have thought the existing staff that run the trains would move locations. Rather than recruit new people in Shipley and then have loads of spare staff in the existing locations (Leeds?)
 

thejuggler

Established Member
Joined
8 Jan 2016
Messages
1,643
Interesting there are new jobs, unless there's a big service uplift planned, I would have thought the existing staff that run the trains would move locations. Rather than recruit new people in Shipley and then have loads of spare staff in the existing locations (Leeds?)
Not so much service uplift, more unit uplift with introduction of 6 cars on the Airedale/Wharfedale triangle. There are also ancilliary jobs in depot facilities management.

Travelling to Shipley isn't a trip I'd relish if I was living somewhere convenient to Neville Hill, its at least 15 miles. I'm only about 7 miles from Shipley and it can take hour to drive at busy times of day.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,851
Interesting there are new jobs, unless there's a big service uplift planned, I would have thought the existing staff that run the trains would move locations. Rather than recruit new people in Shipley and then have loads of spare staff in the existing locations (Leeds?)
Depot staff, not train crew.

Neville Hill will still exist and be used, this is extra capacity and more staff are needed to run it.
 

Top