Shepreth branch junction - foot crossing replacement

Status
Not open for further replies.

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
This will cheer those on here thaat drive trains through Shepreth branch Junction (just south of Cambridge)- there is a planning application in to replace the foot crossing with a bridge.
Whilst a direct link is impossible (due to the trpical terrible local council website) if you search for S/2060/13/FL on the South Cambs District Council planning site you'll find the details.

Closing this foot crossing (and Network Rail are negotiating to close the private farm vehicle access across here as well) will presumably allow the lifting of the TSR through the junction.

Installing the bridge will require a suspension of FCC, Greater Anglia and XC services south of Cambridge. Previously, when installing the road and guided bus bridges,, this meant bus replacement from Cambridge to Audley End, Stansted and Royston.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
seems that they're hoping to close the next crossing northwards (Dukes) by getting access to the fields from the Addenbrookes access road. That'll mean no level crossings between Shepreth Branch Junction and Cambridge
 

A-driver

Established Member
Joined
9 May 2011
Messages
4,482
seems that they're hoping to close the next crossing northwards (Dukes) by getting access to the fields from the Addenbrookes access road. That'll mean no level crossings between Shepreth Branch Junction and Cambridge

I thought dukes was already closed? You certainly won't get any road vehicles over it as the boards have been removed across the railway so you would be driving over rails and ballast.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
It seems it is officially still open- the boards may have gone but the gates remain. A tractor would easily manage that.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
For sighting still, or for something else? My source says NR hope to install the bridge before the end of the financial year (start of April)
 