Mordac
Established Member
Are there any other sections, other than between Amersham and Harrow-on-the-Hill on the Metropolitan Line, where London Underground trains share tracks (not just alignments) with National Rail services?
Are there any other sections, other than between Amersham and Harrow-on-the-Hill on the Metropolitan Line, where London Underground trains share tracks (not just alignments) with National Rail services?
Bakerloo north of Queens Park
District line. South of Turnham Green
East Putney Wimbledon too but no scheduled national rail service runs that route at the moment
Isn't there a late service towards Woking which runs via that route for route knowledge retention?
The Met section is unique in that it is Met track /signalling that Chiltern/National Rail services are allowed to use, where as all the others are the reverse.
I caught the 1825 Waterloo to Basingstoke last Friday, which ran via Southfields to Wimbledon. I was remarkably surprised to see us pass in front of a waiting Wimbledon-bound S8 at East Putney! I thought it was a bit odd that we were on LU territory!
It'll have been an S7 that you passed - S8s are used exclusively on the Met line and aren't cleared* elsewhere.
(*Okay, they can run in certain places under certain circumstances, but this doesn't include the Wimbledon branch and even where they can, never in service.)
Was a typo sorry! I do this more often than not on here!![]()

How will it pan out when TBTC or trains are run auto on these stretches ? Will it be all auto or a mix and if a mix how will it be signalled ?
I knew what you meant!
Getting back on to the subject hand, was there nor a Railtrack proposal around about 1995 to connect the sub-surface line at Paddington suburban to the main line and run main line local trains on it?
The Met section is unique in that it is Met track /signalling that Chiltern/National Rail services are allowed to use, where as all the others are the reverse.
It is LU 4-aspect signalling, with trainstops and fog-repeaters.Is it though? That's certainly the case on the local lines, but on the main lines (where Chiltern run), it looks a lot like standard BR 4-aspect signalling.
I knew what you meant!
Getting back on to the subject hand, was there nor a Railtrack proposal around about 1995 to connect the sub-surface line at Paddington suburban to the main line and run main line local trains on it?
Thales have promised LU that ATC can be overlaid onto the existing system on the Richmond branch, with existing lineside signals remaining in current position.How will it pan out when TBTC or trains are run auto on these stretches ? Will it be all auto or a mix and if a mix how will it be signalled ?
Unfortunately Network Rail, who currently have no Automatic train operations within their Rule Book, remain unconvinced by Thales submissions!
carto.metro shows the southern boundary between National Rail (Chiltern) and LU (Metropolitan) control as being alongside Northwick Park
Doesn't surprise me..
Where you have to have trains fitted with different protection systems it's always best to have the detection (and locking) system be based in the track so that you don't need to have multiple systems feed into the locking computers / frames.
The only ATO capable installations I've seen that would fit that are either;
Westinghouse / Invensys / Siemens DTG-R with it's three aspect signals, with potentially a 4th aspect to run as Green / Yellow / Blue / Red with intermediate block marker boards, any headed signal can also easily incorporate Train Stops, AWS magnets, TPWS loops, Chiltern ATP Loops or even anything up to ERTMS / ETCS Level 1 or Level 2.
Alternatively one could make use of ETRMS / ETCS from day one at Level 3 and not permit any non-ETCS fitted trains to use the line.
Nothing else really allows any level of integration that isn't going to cause significant issues with 'back locking' areas of authority into the CBTC. Where you will essentially need to 'check in' all ATP fitted trains into a zone, probably knowing the number of fitted axles and making use of axle counters, the only other option would be to mode select each zone between CBTC and Track Circuit modes, but that will be exceedingly difficult to achieve on a train by train basis for a mixed traffic railway.
Bakerloo north of queens park
District line. South of turnham green
East Putney wimbledon too but no scheduled national raol service runs that route at the moment
Thales have promised LU that ATC can be overlaid onto the existing system on the Richmond branch, with existing lineside signals remaining in current position.
On the LU owned Wimbledon branch the ATC system will be the principal driver and lineside signals will be repositioned to match the ATC sections. (I believe the MET Line will be the same).
A lineside signal will display a blue aspect for a detected ATC fitted train, whereas normal aspects would be shown for non-ATC fitted trains. It would be quite possible for two ATC fitted trains to go past a traditional signal post, displaying blue, and enter the section in the rear of that signal. However only one non-ATC fitted train would be permitted to enter the same section.
Using sleeper mounted tags and onboard axle counters the ATC system can detect a trains position to within 15cm.
Unfortunately Network Rail, who currently have no Automatic train operations within their Rule Book, remain unconvinced by Thales submissions!
A century ago there were some peak hour through trains from Windsor and Eton Central to Aldgate, crossing to what is now the H&C somewhere near Royal Oak, but I believe that the crossover is long gone.
In those days there would be much less passenger traffic on the north side of the Circle, but there was a lot of coal and other freight traffic to such as Smithfield and Snow Hill.
I believe the through trains from Windsor to the City actually ran on the District line via Ealing Broadway.
The overnight Sleet trains are timetables to do this.A slight addition to the above: Bakerloo trains can and do run as far south as Kilburn High Road in emergency. If a Queen's Park to Harrow shuttle service is required for any reason the standard way of doing it will be in service to Queen's Park then empty reversing via Kilburn High Road up platform.
crossing to what is now the H&C somewhere near Royal Oak, but I believe that the crossover is long gone.
I believe the through trains from Windsor to the City actually ran on the District line via Ealing Broadway.