70014IronDuke
Established Member
- Joined
- 13 Jun 2015
- Messages
- 4,067
Its funded and due in 2021 or 22
Excellent news, thank you.
Its funded and due in 2021 or 22
We hear this every time a new monster comes along. I never believe any of it. England makes it so difficult to get things reopened its tedious.
The cost of the Birdlip Scheme is in the document you put the link to..Where is the carefully conducted public opinion survey showing that there is 'zero public support' for the Expressway road exactly? Perhaps you would care to share this with us.
Plenty of people in Oxfordshire are all in favour of anything that can relieve the A34 between Bicester, Oxford and Abingdon, freeing the Oxford western bypass section from trying to be a national trunk road, city bypass and local distributor road all rolled into one - which it fails at day after day after day - and has done for years.
Plenty of people around ever-growing Aylesbury would probably like to see a decent road in any direction from the town apart from the A41 towards London.
Where does your £300m estimate come from for the A417 'missing link' scheme (east of Gloucester, not south), which will remove the serious bottleneck that currently exists for traffic between Gloucester and Cirencester/Swindon and (via the A436 to Andoversford) the northern part of the Cotswolds? This project has been under discussion for more than 20 years, so inflation and which option (of many put forward) is being talked about inevitably affects the numbers. It was never going to be a cheap job, as it is a difficult location (to put it mildly) and is in an AONB.
https://highwaysengland.co.uk/projects/a417-missing-link/
I am no fan of Mr Cameron but he didn't say that. There is a big difference between funding studies and promising to spend a whole lot more on actually building something. From the BBC News website in January 2015.
https://www.bbc.co.uk/news/uk-england-devon-31042325
In what way was it a key pairing? The number of people wanting to get between Milton Keynes and High Wycombe is limited compared with the number who will find an Aylesbury-MK rail service extremely useful. High Wycombe is tied economically to London and the Thames Valley, not to the far north-east corner of Buckinghamshire. Providing a High Wycombe link comes into the nice to have category.
Extending Marylebone-Aylesbury via High Wycombe trains to MK if of course an option, but doing that would inevitably bring with it the risk of importing and exporting delays on both East-West and the Chiltern Line - there aren't many people around who think that GWR's linking of South Coast to Bristol and the Bristol to Worcester/Great Malvern services has been a runaway success, to take one example of this kind of thing.
Where is the carefully conducted public opinion survey showing that there is 'zero public support' for the Expressway road exactly? Perhaps you would care to share this with us.
Where does your £300m estimate come from for the A417 'missing link' scheme (east of Gloucester, not south), which will remove the serious bottleneck that currently exists for traffic between Gloucester and Cirencester/Swindon and (via the A436 to Andoversford) the northern part of the Cotswolds? This project has been under discussion for more than 20 years, so inflation and which option (of many put forward) is being talked about inevitably affects the numbers. It was never going to be a cheap job, as it is a difficult location (to put it mildly) and is in an AONB.
https://highwaysengland.co.uk/projects/a417-missing-link/
This supports my costs, I knew they were not wrong, I am very close to the project.The Oxford mail and various protest groups have run surveys where most popular choice had been do nothing, then again various groups are opposed to EWR as well. TBH any proposal to introduce new transport infrastructure in this country results in protests from some group of interested or uninterested parties, when actually what is needed is quite lot of new road and rail building in addition to enhancements.
In a joined up system Expressway and EWR would be looking for synergies around shared alignments where sensible...
The previous brown route was estimated at £300m which in the last consultation morphed into option 12 it gained quite a bit of cost in part because a longer route mileage of widening was then proposed and a third crawler lane up the hill. Many, many years ago when the option was the brown route and before that "the loop" it consisted of online widening of the existing A417 to a dual carriageway and a new grade separated junction off to the A436, fairly simple works TBH to uncongest the air balloon roundabout linking up the previously enhanced sections of the A417. The final selected option 30 route is basically a 4 mile long new alignment that will allow NSL running rather than a 40/50 restriction, Birdlip and Cowley become grade separated. The BCR is somewhat poor for the scheme at just over 1 but it IMHO should have been done as part of the 90's brockworth and cirencester schemes. I could see the floated 80's A436 Severn Springs, Kilkenny, A40 realignment possibly coming back as an idea once the A417 missing link is opened.
The cost of the Birdlip Scheme is in the document you put the link to..
It’s presently at £ 560 m , and they have no tenders yet. I have overheard £600m
BCR , less than reopening to Tetbury, I fear .
The Road Lobby, tend to think they have a right to public money ( my money ) , and quite frankly make me sick, with their contempt for taxpayers.
Railways are incredibly good value for money.
The East West Rail report is with the Dft , they have a duty study and respond to the report , this is standard procedure.
They also need to discuss points to the promoter.( network rail)
It is clear Railfuture ( who have lived with this project since 1986 ) , were keen on future proofing ( supporter), this is a cost driver but sensible.
The promotor may have made later reps, re pathing issuesDenbigh Hall N jct to Mk . The objectors were mainly property spivs trying on.
This is a legal process, and comment outside the known facts is sub judiciary.
The Oxford mail and various protest groups have run surveys where most popular choice had been do nothing, then again various groups are opposed to EWR as well. TBH any proposal to introduce new transport infrastructure in this country results in protests from some group of interested or uninterested parties, when actually what is needed is quite lot of new road and rail building in addition to enhancements.
Indeed in theory but in practice using old alignments has the outside possibility of re-usage with the old bulldozing e.g. Tweedbank whilst new routes from scratch with the exception of the odd new curve generally just ain't going to happen.Even taking the 'announcement' with a fistful of salt....
Why, when the boat is floated for an expansion of the rail network, does it alway have to be 'reopening' or 'reversing Beeching'? Unless it's just upgrading a freight-only line, you're building a new railway which happens to call at some of the same places as one that was closed and lifted fifty years ago. It doesn't make sense to commit to an alignment that was selected on the basis of anaemic locomotive performance 150-odd years ago, with requirements to handle stopping goods traffic to every hamlet en route. Especially when that alignment now has 500 homes, a shopping centre, and a small engineering works built on it.
Hmmm... in your enthusiasm to write this reply, you appear to have confused my saying 'This is where you'd probably put the junction, if you wanted to do it' with 'My crayons have proved that this project has a fantastic business case. Shovels out, lads, let's go!'
There is always *a* business case and in fact I do agree - in a BAU world is probably profoundly negative - junctions, tunnel conditions, A14 in the way etc, although my attempt at doing that would be full of guesswork, hearsay and conjecture.
However, this is a long-term proposal, there's considerable uncertainty and a lot can happen. So that is why we always test some what-ifs as part of business case development. I think that if (and it's a pretty big if) there was even a snifter of positive in this one, it would be a scenario where
- Wigston-Syston Capacity Scheme has happened
- MML signalling has been renewed to deliver extra capacity - unless there really never will be any technology to allow Wigston-Harborough to go from 5 --> 7tph
- and...
…this exactly. Which takes us back to the root cause of this particular bout of reopening discussion...
Yes, and the bankruptcy has driven the restructuring into two unitary authorities (West Northants and North Northants UAs).
The regional strategy/urban plan work is now being done, and the proto-West-Northants UA consultation mentioned it, which is what gave Mr Shapps the cheap bit of PR in parliament.
West Northants interest is probably much more about whether it would help allow a significant amount of new developments along the rail corridor (my guesses being Brixworth and/or perhaps a substantial new settlement near the A14) - i.e. it would no longer be going through a lot of nothing, and there would be much more significant passenger numbers than a 'today-based' assessment would tell you.
Even taking the 'announcement' with a fistful of salt....
Why, when the boat is floated for an expansion of the rail network, does it alway have to be 'reopening' or 'reversing Beeching'? Unless it's just upgrading a freight-only line, you're building a new railway which happens to call at some of the same places as one that was closed and lifted fifty years ago. It doesn't make sense to commit to an alignment that was selected on the basis of anaemic locomotive performance 150-odd years ago, with requirements to handle stopping goods traffic to every hamlet en route. Especially when that alignment now has 500 homes, a shopping centre, and a small engineering works built on it.
Yes, and the bankruptcy has driven the restructuring into two unitary authorities (West Northants and North Northants UAs).
The regional strategy/urban plan work is now being done, and the proto-West-Northants UA consultation mentioned it, which is what gave Mr Shapps the cheap bit of PR in parliament.
West Northants interest is probably much more about whether it would help allow a significant amount of new developments along the rail corridor (my guesses being Brixworth and/or perhaps a substantial new settlement near the A14) - i.e. it would no longer be going through a lot of nothing, and there would be much more significant passenger numbers than a 'today-based' assessment would tell you.
Even taking the 'announcement' with a fistful of salt....
Why, when the boat is floated for an expansion of the rail network, does it alway have to be 'reopening' or 'reversing Beeching'? Unless it's just upgrading a freight-only line, you're building a new railway which happens to call at some of the same places as one that was closed and lifted fifty years ago. It doesn't make sense to commit to an alignment that was selected on the basis of anaemic locomotive performance 150-odd years ago, with requirements to handle stopping goods traffic to every hamlet en route. Especially when that alignment now has 500 homes, a shopping centre, and a small engineering works built on it.
It was an ATOC report 'Connecting Communities'.I'm pretty sure that Network Rail a few years ago came up with a listing of "Top 10 possible Beeching reopening" and it is a fairly sensible list but remember this is stuff from Boris with his fantasy bridge across the Thames he got UK taxpayers to pay for and his bridge from Scotland to Northern Ireland etc.
I think there is a very strong case for light-rail-ising branch lines generally where there is no through running or where that through running might have limited value over the benefits light-rail-ising could bring (e.g. with Windermere you could increase frequency more cheaply by giving up just 3tpd to the Airport). Power could either be battery/supercapacitor or DC OHLE, but you could save money by way of allowing cheaper light rail concepts to apply while improving service, e.g. cheaper signalling and passing loops as well as foot crossings and 100% wheelchair accessibility with low floor trams, also making it cheaper to rejig station locations to make them more useful.
I think it's a real shame the St Albans project didn't go ahead to try the concepts out.
Even taking the 'announcement' with a fistful of salt....
Why, when the boat is floated for an expansion of the rail network, does it alway have to be 'reopening' or 'reversing Beeching'? Unless it's just upgrading a freight-only line, you're building a new railway which happens to call at some of the same places as one that was closed and lifted fifty years ago. It doesn't make sense to commit to an alignment that was selected on the basis of anaemic locomotive performance 150-odd years ago, with requirements to handle stopping goods traffic to every hamlet en route. Especially when that alignment now has 500 homes, a shopping centre, and a small engineering works built on it.
The undo Beeching stuff is really getting dull. If there is money spare let’s throw it at making what we have much better - electrification, cut offs and speed ups, and improving northern commuter networks.
Can we restart electrification projects and not leave main lines across the country with half assed electrification? Fully electrify the MML to Sheffield, Nottingham and Derby would be a start!
Back on topic though, maybe reopen Ripon to Harrogate and Skipton to Colne.
Quote
The sad thing is that cynical opportunist people like Shapps do this because they know that that's where votes are - both in the general public and in significant numbers of "enthusiasts" - it's not about problem solving, it's about "comfortable" policies for nostalgic people. Hence getting over a hundred posts on here, because unquantified nostalgia never goes out of fashion.
How do you know he is a cynical opportunist? Give the man time p;lease. if the government get back and if after 5 years nothing has changed then yes, you can call him that but not after about 6 weeks in the job.
Regarding the Railways there`s more weasel words coming out of the labour party . Just look at how many miles labour electrified in their 13 years in power. Not even in double figures I think you will find.
Quote
The sad thing is that cynical opportunist people like Shapps do this because they know that that's where votes are - both in the general public and in significant numbers of "enthusiasts" - it's not about problem solving, it's about "comfortable" policies for nostalgic people. Hence getting over a hundred posts on here, because unquantified nostalgia never goes out of fashion.
How do you know he is a cynical opportunist? Give the man time p;lease. if the government get back and if after 5 years nothing has changed then yes, you can call him that but not after about 6 weeks in the job.
Regarding the Railways there`s more weasel words coming out of the labour party . Just look at how many miles labour electrified in their 13 years in power. Not even in double figures I think you will find.
Just look at how many miles labour electrified in their 13 years in power. Not even in double figures I think you will find.
I'm pretty sure that Network Rail a few years ago came up with a listing of "Top 10 possible Beeching reopening" and it is a fairly sensible list but remember this is stuff from Boris with his fantasy bridge across the Thames he got UK taxpayers to pay for and his bridge from Scotland to Northern Ireland etc.
Being in favour of nationalisation does not mean you do not have a clue about the railways. There are also plenty of people outside the Labour Party who see nationalisation as an essential step if we are ever going to get our railway out of the mess it's in.High Speed 1 is 67 miles, Crewe to Kidsgrove is 8 miles and the South Hylton extention on the Tyne and Wear Metro is 11 miles all done under Tony Blair/Gordon Brown. There were a lot of proposals that never came to fruition under that government however.
I would agree though that Labour hasn't got a clue with the railways and in recent years its about been about nationalisation.
New lines, stations and re-openings will have a bigger effect on more people than just improving/electrifying existing lines. More people will be attracted to the railways (which is the whole point) by a new line or station than by electrifying an existing line, or straightening a curve etc. If they are serious about getting people out of cars and onto the railways, they need new lines/stations.
This supports my costs, I knew they were not wrong, I am very close to the project.
The BCR as I suspected is noted as 1, in fact it may drop to .8 by completion ( destroying national value!).
The Cirencester Branch reopening I would be 1.5 or more.
These are political decisions, not ones taken by economists who generally understand the maths .
It annoys me intensely Birdlip, has the go ahead , and good rail schemes with more benefit to UKplc, are stuck in the siding .
Shapps is trying to get votes for the Conservative Party as he knows there is going to be a General Election soon.
I have lost count of the amount of times I have heard about the government "reversing Beeching Cuts" or having "massive expansion" to the railway network but in reality nothing will happen. Think about it how many lines have been proposed for reopening but nothing has ever materialised.